PEDESTRIAN DELAY AND TRAFFIC MANAGEMENT.

被引:0
|
作者
Goldschmidt, J.
机构
关键词
MATHEMATICAL MODELS - TRAFFIC SURVEYS;
D O I
暂无
中图分类号
学科分类号
摘要
The report summarizes a two-year study of the relationships between the delays to pedestrians crossing urban streets and traffic and layout characteristics. A method for estimating pedestrian delays using a trained observer was developed and tested. This was used to record delays at sites where only few pedestrians crossed the road, while waiting times were observed directly at points with higher crossling flows. Four-hundred-twenty-three surveys of delays, traffic and layout characteristics were conducted. Predictive equations for the mean delay and proportion of pedestrians delayed at the various types of location were developed, using multiple linear regression.
引用
收藏
相关论文
共 50 条
  • [31] Simultaneous Traffic Management Initiatives: The Double Delay Problem
    Vlachou, Kleoniki
    Sharma, Rohit
    Wieland, Frederick
    2019 IEEE/AIAA 38TH DIGITAL AVIONICS SYSTEMS CONFERENCE (DASC), 2019,
  • [32] Traffic management strategy for delay-tolerant networks
    Shin, Kwangcheol
    Kim, Kyungjun
    Kim, Soontae
    JOURNAL OF NETWORK AND COMPUTER APPLICATIONS, 2012, 35 (06) : 1762 - 1770
  • [33] Stress management.
    Smaglik P.
    Nature, 2006, 439 (7076) : 629 - 629
  • [34] PROJECT MANAGEMENT.
    Snowdon, M.
    Proceedings of the Institution of Civil Engineers (London). Part 1 - Design & Construction, 1979, 66 (pt 1): : 625 - 633
  • [35] Energy management.
    Zeppenfeld, R
    KUNSTSTOFFE-PLAST EUROPE, 1997, 87 (01): : A38 - A40
  • [36] HEALTH MANAGEMENT.
    Azevedo, Creuza da Silva
    CADERNOS DE SAUDE PUBLICA, 2012, 28 (09): : 1811 - 1812
  • [37] PROJECT MANAGEMENT.
    Pozzi, Angelo
    DeBenedittis, Charles A.
    Knoepfel, Hans
    Journal of Great Lakes Research, 1981, : 863 - 1034
  • [38] Infant management.
    不详
    LANCET, 1913, 1 : 1126 - 1126
  • [39] Companies and their management.
    不详
    CFI-CERAMIC FORUM INTERNATIONAL, 1997, 74 (09): : 548 - 548
  • [40] COST MANAGEMENT.
    Wizdo, Allen
    Manufacturing Systems, 1987, 5 (06):