Integrated project operations and personnel scheduling with multiple labour classes

被引:0
|
作者
Alfares, Hesham K. [1 ,4 ]
Bailey, James E. [2 ,5 ]
Lin, Wen Y. [3 ,6 ]
机构
[1] King Fahd Univ. Petrol. and Minerals, P.O. Box 2003, Dhahran, Saudi Arabia
[2] Indust. and Mgmt. Syst. Eng. Dept., Arizona State University, P.O. Box 875906, Tempe, AZ 85287-5906, United States
[3] America West Airlines, 4000 E. Sky Harbor Blvd., Phoenix, AZ 85034, United States
[4] Systems Engineering Department, King Fahd Univ. Petroleum Minerals, Dhahran, Saudi Arabia
[5] Wayne State University, Detroit, MI, United States
[6] America West Airlines, Phoenix, AZ, United States
来源
Production Planning and Control | 1999年 / 10卷 / 06期
关键词
D O I
暂无
中图分类号
学科分类号
摘要
19
引用
收藏
页码:570 / 578
相关论文
共 50 条
  • [31] An exact algorithm for project scheduling with multiple modes
    Sprecher A.
    Hartmann S.
    Drexl A.
    [J]. Operations-Research-Spektrum, 1997, 19 (3) : 195 - 203
  • [32] Project scheduling with multiple modes: A genetic algorithm
    Hartmann, S
    [J]. ANNALS OF OPERATIONS RESEARCH, 2001, 102 (1-4) : 111 - 135
  • [33] Project Scheduling with Multiple Modes: A Genetic Algorithm
    Sönke Hartmann
    [J]. Annals of Operations Research, 2001, 102 : 111 - 135
  • [34] An exact algorithm for project scheduling with multiple modes
    Sprecher, A
    Hartmann, S
    Drexl, A
    [J]. OR SPEKTRUM, 1997, 19 (03) : 195 - 203
  • [35] MULTIPLE ROUTINGS AND REACTION PATHS IN PROJECT SCHEDULING
    RICH, SH
    PROKOPAKIS, GJ
    [J]. INDUSTRIAL & ENGINEERING CHEMISTRY RESEARCH, 1987, 26 (09) : 1940 - 1943
  • [36] Heuristic decomposition approaches for an integrated task scheduling and personnel rostering problem
    Smet, Pieter
    Ernst, Andreas T.
    Berghe, Greet Vanden
    [J]. COMPUTERS & OPERATIONS RESEARCH, 2016, 76 : 60 - 72
  • [37] Integrated scheduling of multiple heterogeneous equipment and maintenance operations during discharging process in a container terminal under uncertainty
    Abyaneh, M. Basir
    Vahdani, Behnam
    Nadjafi, Afshar
    Amiri, M.
    [J]. COMPUTERS & INDUSTRIAL ENGINEERING, 2024, 193
  • [38] An Integrated Task and Personnel Scheduling Problem to Optimize Distributed Services in Hospitals
    Campana, Nicolas P.
    Zucchi, Giorgio
    Iori, Manuel
    Magni, Carlo Alberto
    Subramanian, Anand
    [J]. PROCEEDINGS OF THE 23RD INTERNATIONAL CONFERENCE ON ENTERPRISE INFORMATION SYSTEMS (ICEIS 2021), VOL 1, 2021, : 463 - 472
  • [39] Integrated project scheduling and material ordering: A literature review
    Hu X.-J.
    Wang J.-J.
    Cui N.-F.
    Lai H.-L.
    [J]. Kongzhi yu Juece/Control and Decision, 2022, 37 (09): : 2189 - 2200
  • [40] Integrated resource management for simultaneous project selection and scheduling
    Shariatmadari, Mohammad
    Nahavandi, Nasim
    Zegordi, Seyed Hessameddin
    Sobhiyah, Mohammad Hossein
    [J]. COMPUTERS & INDUSTRIAL ENGINEERING, 2017, 109 : 39 - 47