共 37 条
- [24] Determination of Favorable Time Window for Infrared Inspection by Numerical Simulation of Heat Propagation in Concrete PROCEEDINGS OF 3RD INTERNATIONAL SUSTAINABLE BUILDINGS SYMPOSIUM (ISBS 2017), VOL 2, 2018, 7 : 577 - 591
- [25] Determination for mine construction project time and its parameters using network planning technique PROCEEDINGS OF THE 2016 6TH INTERNATIONAL CONFERENCE ON MACHINERY, MATERIALS, ENVIRONMENT, BIOTECHNOLOGY AND COMPUTER (MMEBC), 2016, 88 : 2198 - 2202
- [26] Construction simulation approach of roller-compacted concrete dam based on real-time monitoring JOURNAL OF ZHEJIANG UNIVERSITY-SCIENCE A, 2018, 19 (05): : 367 - 383
- [27] Construction of reinforced concrete multi-storey office buildings: a simulation model for time/cost calculations Building Research and Information, 1995, 23 (04): : 227 - 233
- [28] DETERMINATION OF FLOAT TIME FOR INDIVIDUAL CONSTRUCTION TASKS USING CONSTRAINT-BASED DISCRETE-EVENT SIMULATION 2012 WINTER SIMULATION CONFERENCE (WSC), 2012,
- [30] A genetic algorithm framework for time-efficient reinforced concrete work in multi-story building construction with partial striking technique JOURNAL OF BUILDING ENGINEERING, 2023, 73