共 50 条
- [32] AUTOMATION CUTS BOARD ASSEMBLY CYCLE TIME BY 25-PERCENT I&CS-CONTROL TECHNOLOGY FOR ENGINEERS AND ENGINEERING MANAGEMENT, 1989, 62 (06): : 93 - 95
- [33] DIAMOND DRILLING OF PLASTIC COIL FORMERS CUTS MACHINING COSTS BY 3500 PERCENT INDUSTRIAL DIAMOND REVIEW, 1974, (JAN): : 20 - 21
- [34] CATALYTIC-OXIDATION SYSTEM CUTS FUEL COSTS BY 55PERCENT FOOD ENGINEERING, 1976, 48 (08): : 64 - 65
- [35] DXDA-MC CUTS LATHE BED GRINDING COSTS BY 40 PERCENT INDUSTRIAL DIAMOND REVIEW, 1971, 31 (369): : 307 - &
- [39] High-performance steel cuts costs on bridge project CIVIL ENGINEERING, 1997, 67 (10): : 12 - 13