Pipeline tow cuts installation costs offshore Tunisia

被引:0
|
作者
Hagood, Scott [1 ]
Hajji, Tahar [1 ]
Perera, Ed [1 ]
机构
[1] Anadarko Algeria Corp, Houston, United States
来源
Oil and Gas Journal | 1995年 / 93卷 / 09期
关键词
D O I
暂无
中图分类号
学科分类号
摘要
引用
收藏
页码:45 / 49
相关论文
共 50 条
  • [41] COMPUTER-ASSISTED DESIGN CUTS COSTS FOR PIPELINE PROJECT.
    Stiles, Richard J.
    Briggs, Larry L.
    Oil and Gas Journal, 1984, 82 (26): : 84 - 86
  • [42] Modeling offshore wind installation costs on the US Outer Continental Shelf
    Kaiser, Mark J.
    Snyder, Brian F.
    RENEWABLE ENERGY, 2013, 50 : 676 - 691
  • [43] MECHANICAL DRY SEAL CUTS PIPELINE COMPRESSOR MAINTENANCE COSTS, DOWNTIME
    HESJE, RC
    PETERSON, RA
    OIL & GAS JOURNAL, 1985, 83 (11) : 150 - &
  • [44] Computerization cuts 700-mile pipeline CP operating costs
    Gas Industries (Park Ridge, Illinois), 1992, 36 (11):
  • [45] Pipeline installation
    Orelyana, I
    NEFTYANOE KHOZYAISTVO, 2004, (10): : 124 - 126
  • [47] QUICK-CONNECT PIPE CUTS INSTALLATION COSTS AT BARNES & TUCKER MINES.
    Anon
    Coal Age, 1975, 80 (07): : 102 - 104
  • [48] Methodology to calculate the installation costs of offshore wind farms located in deep waters
    Castro-Santos, Laura
    Filgueira-Vizoso, Almudena
    Lamas-Galdo, Isabel
    Carral-Couce, Luis
    JOURNAL OF CLEANER PRODUCTION, 2018, 170 : 1124 - 1135
  • [49] Development and sea trial of real-time offshore pipeline installation monitoring system
    Wang, Facheng
    Chen, Juan
    Gao, Shuang
    Tang, Ke
    Meng, Xiangwei
    OCEAN ENGINEERING, 2017, 146 : 468 - 476
  • [50] IT CUTS COSTS
    不详
    FOOD ENGINEERING, 1984, 56 (07): : 57 - 57