SYSTEM DESIGN AND EQUIPMENT SPECIFICATION.

被引:0
|
作者
Dempsey, R.
Faulks, B.
机构
关键词
DIGITAL COMMUNICATION SYSTEMS - OPTICAL FIBERS - SYSTEMS ENGINEERING;
D O I
暂无
中图分类号
学科分类号
摘要
The system design of the Melbourne-Canberra-Sydney SMOF route took place over the period 1984 to 1987 during which dramatic advances in cable and equipment performance occurred. The final savings in reduced equipment quantities were substantial. The design stages are outlined.
引用
收藏
页码:65 / 67
相关论文
共 50 条
  • [31] RTCM SC-104 RECOMMENDED PSEUDOLITE SIGNAL SPECIFICATION.
    Stansell, Thomas A.Jr
    1600, (33):
  • [32] Equipment specification
    Trucking Technology, 1998, 5 (02):
  • [33] The effects of altering the position of the cleavage planes in eggs with precocious specification.
    Morgan, TH
    ARCHIV FUR ENTWICKLUNGSMECHANIK DER ORGANISMEN, 1910, 29 (02): : 205 - 224
  • [34] Equipment specification
    Truck Technol, 3 (38):
  • [35] Equipment specification
    Trucking Technology, 1998, 5 (04):
  • [36] Equipment specification
    Trucking Technology, 1998, 5 (06):
  • [37] SYSTEMS FOR PUMPING VISCOUS LIQUIDS - 3. PUMP SIZING AND SPECIFICATION.
    Meier, Don
    Plant Engineering (Barrington, Illinois), 1978, 32 (09): : 93 - 97
  • [38] Analysis of the role of Sfrp-3 in chick neural crest specification.
    Acosta, LD
    Galli, LM
    Cheng, T
    Burrus, LW
    DEVELOPMENTAL BIOLOGY, 2004, 271 (02) : 579 - 579
  • [39] RADIAL, MIXED AND AXIAL FLOW PUMPS. SIZE ESTIMATION, AND SPECIFICATION.
    Anon
    Engineering Sciences Data Unit, Data Items, 1980,
  • [40] Sox17 and beta-catenin in Xenopus endoderm specification.
    Zorn, AM
    Sinner, D
    Rankin, S
    Lee, M
    DEVELOPMENTAL BIOLOGY, 2004, 271 (02) : 556 - 556