Long-Distance Transport System for the Schwandorf Refuse Incineration Power Plant.

被引:0
|
作者
Klofat, H.J. [1 ]
机构
[1] Zweckverband Muelkraftwerk, Schwandorf, Regensburg, West Ger, Zweckverband Muelkraftwerk Schwandorf, Regensburg, West Ger
来源
VGB-Kraftwerkstechnik | 1985年 / 65卷 / 12期
关键词
ELECTRIC POWER PLANTS - Fuels - FUELS - Refuse Derived Fuels - HAZARDOUS MATERIALS - Transportation - RAILROAD TRANSPORTATION;
D O I
暂无
中图分类号
学科分类号
摘要
More than 90% of the waste to be burned at the Schwandorf refuse incineration power plant has to be transported to Schwandorf from distances of up to 140 km (about 320,000 t per year). Extensive analyses of problems of siting, transport routeing and transport system have been carried out to meet this special challenge. The choice fell on a rail system with special equipment for loading, unloading, storage in transit, compaction and trans-shipment to decentralized collecting points. From here removal is effected in special containers by trains operating on a 24-hour cycle.
引用
收藏
页码:1144 / 1150
相关论文
共 50 条