MULTIVARIABLE FEEDWATER CONTROL DESIGN FOR A STEAM GENERATOR.

被引:2
|
作者
Younkins, Thomas D. [1 ]
Chow, Joe H. [1 ]
机构
[1] GE, Schenectady, NY, USA, GE, Schenectady, NY, USA
来源
IEEE Control Systems Magazine | 1988年 / 8卷 / 02期
关键词
D O I
10.1109/37.1878
中图分类号
学科分类号
摘要
5
引用
收藏
页码:77 / 80
相关论文
共 50 条
  • [21] DEVELOPMENT OF LEAK DETECTION SYSTEMS FOR LMFBR STEAM GENERATOR.
    Sano, Yuji
    Kakuta, Akio
    Sato, Masuo
    Adachi, Shigeru
    Nei, Hiromichi
    Toshiba review International ed., 1979, (124): : 14 - 17
  • [22] DRUM WATER LEVEL IN MULTIVARIABLE CONTROL-SYSTEM OF A STEAM-GENERATOR
    SCHULZ, R
    IEEE TRANSACTIONS ON INDUSTRIAL ELECTRONICS AND CONTROL INSTRUMENTATION, 1973, IE20 (03): : 164 - 169
  • [23] A robust estimator-based optimal algebraic approach to steam generator feedwater control system
    Ablay, Gunyaz
    TURKISH JOURNAL OF ELECTRICAL ENGINEERING AND COMPUTER SCIENCES, 2016, 24 (01) : 206 - 218
  • [24] BEHAVIOR OF CERTAIN IMPURITIES OF FEEDWATER IN A SUPERCRITICAL STEAM-GENERATOR
    PODOBED, OP
    THERMAL ENGINEERING, 1975, 22 (02) : 81 - 85
  • [25] PGV-1500 steam generator. New problems and solutions
    Dragunov, YG
    Lukasevich, BI
    Trunov, NB
    Kharchenko, SA
    Sotskov, VV
    ATOMIC ENERGY, 2005, 99 (06) : 849 - 857
  • [26] PGV-1500 steam generator. New problems and solutions
    Yu. G. Dragunov
    B. I. Lukasevich
    N. B. Trunov
    S. A. Kharchenko
    V. V. Sotskov
    Atomic Energy, 2005, 99 : 849 - 857
  • [27] DESIGN AND FABRICATION OF A MONODISPERSE AEROSOL GENERATOR.
    Chan, Kwan-Kit
    Chen, Long-Jen
    Chung-kuo Kung Ch'eng Hsueh K'an/Journal of the Chinese Institute of Engineers, 1984, 7 (04): : 271 - 277
  • [28] STEAM-GENERATOR FEEDWATER PIPE CRACKING IN NUCLEAR STEAM SUPPLY-SYSTEMS
    SCHLOSS, SM
    RAGL, A
    TRANSACTIONS OF THE AMERICAN NUCLEAR SOCIETY, 1980, 35 (NOV): : 500 - 501
  • [29] Supervision of an industrial steam generator. Part II: Online implementation
    Medjaher, K
    Samantaray, AK
    Bouamama, BO
    Staroswiecki, M
    CONTROL ENGINEERING PRACTICE, 2006, 14 (01) : 85 - 96
  • [30] CALIBRATION OF INSTRUMENTED STEAM SEPARATORS TO DETERMINE QUALITY AND FLOW DISTRIBUTION IN AN OPERATING STEAM GENERATOR.
    Teigen, B.C.
    Sodergren, J.H.
    Electric Power Research Institute (Report) EPRI NP, 1983,