共 50 条
- [1] Cost-benefit analysis of a two-unit standby system with post-repair, activation time and correlated failures and repairs Journal of Quality in Maintenance Engineering, 1997, 3 (01): : 55 - 63
- [3] PROFIT ANALYSIS OF THREE UNIT COLD STANDBY SYSTEM WITH CORRELATED FAILURES AND REPAIRS INTERNATIONAL JOURNAL OF AGRICULTURAL AND STATISTICAL SCIENCES, 2009, 5 (01): : 123 - 130
- [5] A COLD STANDBY SYSTEM WITH ARRIVAL TIME OF SERVER AND CORRELATED FAILURES AND REPAIRS MICROELECTRONICS AND RELIABILITY, 1995, 35 (04): : 739 - 742
- [6] STOCHASTIC BEHAVIOUR OF A TWO-UNIT COLD STANDBY REDUNDANT SYSTEM WITH ADMINISTRATIVE DELAY AND TWO TYPES OF REPAIRS. Microelectronics Reliability, 1986, 26 (05): : 885 - 889
- [7] ANALYSIS OF A 2-UNIT STANDBY SYSTEM WITH PREPARATION TIME AND CORRELATED FAILURES AND REPAIRS MICROELECTRONICS AND RELIABILITY, 1995, 35 (08): : 1163 - 1165
- [8] A 2-UNIT COLD STANDBY SYSTEM WITH ALLOWED DOWN-TIME AND CORRELATED FAILURES AND REPAIRS MICROELECTRONICS AND RELIABILITY, 1992, 32 (04): : 503 - 507
- [10] Two-unit system with correlated failures and repairs, and random appearance and disappearance of repairman Int J Syst Sci, 6 (561-566):