共 50 条
- [3] Method to control construction schedule based on FDP [J]. Harbin Gongye Daxue Xuebao, 2008, 12 (2068-2071):
- [4] Study on Application of Monte Carlo Simulation in Construction Schedule Management [J]. ADVANCED RESEARCH ON CIVIL ENGINEERING, MATERIALS ENGINEERING AND APPLIED TECHNOLOGY, 2014, 859 : 284 - 288
- [5] Construction Management in Civil and Hydraulic Engineering [J]. Journal of the Chinese Institute of Civil and Hydraulic Engineering, 2019, 31 (02):
- [6] The Research for 3D Design Method of Hydraulic and Hydropower Engineering Based on CATIA [J]. PROCEEDINGS OF THE 5TH INTERNATIONAL YELLOW RIVER FORUM ON ENSURING WATER RIGHT OF THE RIVER'S DEMAND AND HEALTHY RIVER BASIN MAINTENANCE, VOL IV, 2015, : 402 - 408
- [7] Application of Visual Simulation to Optimize Tunnel Schedule Engineering [J]. ECBI: 2009 INTERNATIONAL CONFERENCE ON ELECTRONIC COMMERCE AND BUSINESS INTELLIGENCE, PROCEEDINGS, 2009, : 238 - +
- [8] Fuzzy optimization of construction engineering project schedule based on critical chain management [J]. Liu, J. (Liujb71@sina.cn), 2013, Universitas Ahmad Dahlan, Jalan Kapas 9, Semaki, Umbul Harjo,, Yogiakarta, 55165, Indonesia (11):
- [9] A Research on Quality Control of Hydraulic Engineering Construction [J]. TECHNOLOGY FOR EDUCATION AND LEARNING, 2012, 136 : 779 - 784
- [10] Study on year generation schedule for hydropower enterprises based on group decision making method [J]. Sichuan Daxue Xuebao (Gongcheng Kexue Ban)/Journal of Sichuan University (Engineering Science Edition), 2009, 41 (05): : 54 - 58