共 50 条
- [1] NUMERICAL SIMULATION ON THE SETTLEMENT TIME PROPERTY OF PILE-SLAB COMPOSITE FOUNDATION [J]. KEY TECHNOLOGIES OF RAILWAY ENGINEERING - HIGH SPEED RAILWAY, HEAVY HAUL RAILWAY AND URBAN RAIL TRANSIT, 2010, : 495 - 500
- [2] Study on the Calculation of the Post-construction Settlement after the Secondary Preloading of Sand Pile Composite Foundation of the High-speed Railway [J]. 2018 3RD INTERNATIONAL CONFERENCE ON CIVIL ENGINEERING AND MATERIALS SCIENCE (ICCEMS 2018), 2018, 206
- [4] STUDY ON CORRELATION COMBINATION FORECAST OF POST-CONSTRUCTION SETTLEMENT OF HIGH-SPEED RAILWAY BRIDGE PILE FOUNDATION [J]. KEY TECHNOLOGIES OF RAILWAY ENGINEERING - HIGH SPEED RAILWAY, HEAVY HAUL RAILWAY AND URBAN RAIL TRANSIT, 2010, : 902 - 909
- [5] DISCUSSING ON SETTLEMENT CALCULATION PROBLEM OF CFG PILE COMPOSITE FOUNDATION IN HIGH-SPEED RAILWAY STATION [J]. NEW TECHNOLOGIES OF RAILWAY ENGINEERING, 2012, : 403 - 407
- [8] A computational method for post-construction settlement of high-speed railway bridge pile foundation considering soil creep effect [J]. Journal of Central South University, 2014, 21 : 2921 - 2927
- [10] STUDY ON THE INFLUENCE ON DEWATERING INDUCED SETTLEMENT OF CFG PILE COMPOSITE FOUNDATION IN HIGH-SPEED RAILWAY STATION [J]. NEW TECHNOLOGIES OF RAILWAY ENGINEERING, 2012, : 501 - 504