A metamodeling based seismic life-cycle cost assessment framework for highway bridge structures

被引:0
|
作者
Shekhar, Shivang [1 ]
Ghosh, Jayadipta [2 ]
机构
[1] Graduate Student, Department of Civil Engineering, Indian Institute of Technology Bombay, Mumbai,400076, India
[2] Assistant Professor, Department of Civil Engineering, Indian Institute of Technology Bombay, Mumbai,400076, India
关键词
54;
D O I
暂无
中图分类号
学科分类号
摘要
引用
收藏
相关论文
共 50 条
  • [41] MAINTENANCE STRATEGY TO OPTIMIZE BRIDGE LIFE-CYCLE COST
    Li, Xin-Ping
    Hong, Yi-Dong
    [J]. 4TH INTERNATIONAL SYMPOSIUM ON LIFETIME ENGINEERING OF CIVIL INFRASTRUCTURE, 2009, : 249 - 254
  • [42] Performance based life-cycle cost assessment of composites in construction
    Hastak, M
    Mirmiran, A
    Richard, D
    [J]. FRP COMPOSITES IN CIVIL ENGINEERING, VOLS I AND II, PROCEEDINGS, 2001, : 1707 - 1714
  • [43] Life-cycle cost optimization of steel structures
    Sarma, KC
    Adeli, H
    [J]. INTERNATIONAL JOURNAL FOR NUMERICAL METHODS IN ENGINEERING, 2002, 55 (12) : 1451 - 1462
  • [44] Life-cycle cost design of deteriorating structures
    Frangopol, DM
    Lin, KY
    Estes, AC
    [J]. JOURNAL OF STRUCTURAL ENGINEERING-ASCE, 1997, 123 (10): : 1390 - 1401
  • [45] Life-cycle cost design of deteriorating structures
    Li, CQ
    [J]. JOURNAL OF STRUCTURAL ENGINEERING, 1998, 124 (11) : 1367 - 1368
  • [46] INCORPORATING LIFE-CYCLE COSTS IN HIGHWAY-BRIDGE PLANNING AND DESIGN
    MOHAMMADI, J
    GURALNICK, SA
    YAN, L
    [J]. JOURNAL OF TRANSPORTATION ENGINEERING-ASCE, 1995, 121 (05): : 417 - 424
  • [47] Life-cycle based resilience assessment of bridges under seismic hazard
    Sharanbaswa, B.
    Banerjee, S.
    [J]. LIFE-CYCLE ANALYSIS AND ASSESSMENT IN CIVIL ENGINEERING: TOWARDS AN INTEGRATED VISION, 2019, : 931 - 937
  • [48] Life-cycle cost assessment model for fiber reinforced polymer bridge deck panels
    Hong, TaeHoon
    Hastak, Makarand
    [J]. CANADIAN JOURNAL OF CIVIL ENGINEERING, 2007, 34 (08) : 976 - 991
  • [49] Development of life-cycle cost based budget allocation system for bridge group
    Miyamoto, Ayaho
    Uchino, Hidehiro
    [J]. LIFE-CYCLE CIVIL ENGINEERING, 2008, : 843 - 849
  • [50] Life-cycle cost based maintenance plan for steel bridge protection systems
    Zayed, TM
    Chang, LM
    Fricker, JD
    [J]. JOURNAL OF PERFORMANCE OF CONSTRUCTED FACILITIES, 2002, 16 (02) : 55 - 62