Unified modeling and intelligent algorithm of production planning for the process of steelmaking, continuous casting and hot rolling

被引:0
|
作者
Zheng, Zhong [1 ]
Liu, Yi [1 ]
Chen, Kai [1 ]
Gao, Xiao-Qiang [2 ]
机构
[1] College of Material Science and Engineering, Chongqing University, Chongqing 400030, China
[2] College of Economics and Business Administration, Chongqing University, Chongqing 400030, China
关键词
D O I
暂无
中图分类号
学科分类号
摘要
引用
下载
收藏
页码:687 / 693
相关论文
共 50 条
  • [41] Optimizing steel coil production schedules under continuous casting and hot rolling
    Torres, Nelson
    Greivel, Gus
    Betz, Joshua
    Moreno, Eduardo
    Newman, Alexandra
    Thomas, Brian
    EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2024, 314 (02) : 496 - 508
  • [42] RESCHEDULING OPTIMIZATION OF STEELMAKING-CONTINUOUS CASTING PROCESS BASED ON THE LAGRANGIAN HEURISTIC ALGORITHM
    Sun, Liangliang
    Luan, Fangjun
    Ying, Yu
    Mao, Kun
    JOURNAL OF INDUSTRIAL AND MANAGEMENT OPTIMIZATION, 2017, 13 (03) : 1431 - 1448
  • [43] An effective evolutionary algorithm for steelmaking and continuous casting scheduling
    Wang, Qing
    Wang, Hehui
    Huang, Min
    PROCEEDINGS OF THE 33RD CHINESE CONTROL AND DECISION CONFERENCE (CCDC 2021), 2021, : 4039 - 4044
  • [44] A hybrid differential evolution algorithm for steelmaking and continuous casting
    Liu, Yang
    Liu, Min
    Hao, Jinghua
    PROCEEDINGS OF THE SECOND INTERNATIONAL CONFERENCE ON MODELLING AND SIMULATION (ICMS2009), VOL 7, 2009, : 124 - 130
  • [45] Appling an improved genetic algorithm for solving the production scheduling problem of steelmaking and continuous casting
    Wang, Hong-Bing
    Xu, An-Jun
    Yao, Lin
    Tian, Nai-Yuan
    Du, Xi
    Beijing Keji Daxue Xuebao/Journal of University of Science and Technology Beijing, 2010, 32 (09): : 1232 - 1237
  • [46] Research and Application of Integrated Scheduling System of Steelmaking-Continuous Casting-Hot Rolling in Shagang Group
    Liu Lijun
    Wen Zhi
    Su Fuyong
    Dou Ruifeng
    Liu Xunliang
    Lou Guofeng
    MECHANICAL ENGINEERING AND TECHNOLOGY, 2012, 125 : 477 - 483
  • [47] UML-based modeling for steelmaking-continuous casting production scheduling system
    Li, TK
    Liu, W
    Wang, J
    7TH WORLD MULTICONFERENCE ON SYSTEMICS, CYBERNETICS AND INFORMATICS, VOL XVI, PROCEEDINGS: SYSTEMICS AND INFORMATION SYSTEMS, TECHNOLOGIES AND APPLICATION, 2003, : 48 - 52
  • [48] A Rescheduling Method for Operation Time Delay Disturbance in Steelmaking and Continuous Casting Production Process
    Yu Sheng-ping
    Pan Quan-ke
    JOURNAL OF IRON AND STEEL RESEARCH INTERNATIONAL, 2012, 19 (12) : 33 - 41
  • [49] A Rescheduling Method for Operation Time Delay Disturbance in Steelmaking and Continuous Casting Production Process
    Sheng-ping Yu
    Quan-ke Pan
    Journal of Iron and Steel Research International, 2012, 19 : 33 - 41
  • [50] A Scheduling Method Based on NSGA2 for Steelmaking and Continuous Casting Production Process
    Li, Qing
    Wang, Xiuying
    Zhang, Xiaofeng
    IFAC PAPERSONLINE, 2018, 51 (18): : 174 - 179