Scheduling an assembly job shop production system with multiple objectives: A simulation study

被引:0
|
作者
Paul M. [1 ]
Sridharan R. [1 ]
RadhaRamanan T. [1 ]
机构
[1] Department of Mechanical Engineering, National Institute of Technology, Calicut
关键词
A[!text type='JS']JS[!/text; Assembly job shop; GRA; Grey relational analysis; Multi-objective; Scheduling; Simulation;
D O I
10.1504/IJISE.2019.102049
中图分类号
学科分类号
摘要
This paper presents the salient aspects of the performance analysis of two mechanisms for shop floor control namely, order review/release (ORR) and dispatching rules in an assembly job shop system in a multi-objective environment. A simulation model of an assembly job shop is developed for experimentation with eight dispatching rules and four ORR mechanisms from the literature. An ORR policy based on the concept of backward scheduling and interval release is developed and incorporated in the simulation model. Grey relational analysis is used for ranking the ORR policy-dispatching rule combinations. Multivariate and univariate hypotheses are developed. The results are analysed using ANOVA and MANOVA. The analysis of results reveals that integrating dispatching rules with ORR policies provides better system performance than using dispatching rules alone. The proposed ORR policy namely, backward scheduling with interval release policy provides better results than other ORR polices. © 2019 Inderscience Enterprises Ltd.
引用
收藏
页码:97 / 128
页数:31
相关论文
共 50 条
  • [1] A SEMANTIC SIMILARITY BASED DISPATCHING RULE SELECTION SYSTEM FOR JOB SHOP SCHEDULING WITH MULTIPLE PRODUCTION OBJECTIVES
    Zhang, Heng
    Roy, Utpal
    INTERNATIONAL DESIGN ENGINEERING TECHNICAL CONFERENCES AND COMPUTERS AND INFORMATION IN ENGINEERING CONFERENCE, 2015, VOL 1B, 2016,
  • [2] Production scheduling in a process and assembly job shop
    McKoy, DHC
    Egbelu, PJ
    PRODUCTION PLANNING & CONTROL, 1999, 10 (01) : 76 - 86
  • [3] Pareto archived simulated annealing for job shop scheduling with multiple objectives
    R.K. Suresh
    K.M. Mohanasundaram
    The International Journal of Advanced Manufacturing Technology, 2006, 29 : 184 - 196
  • [4] Pareto archived simulated annealing for job shop scheduling with multiple objectives
    Suresh, R. K.
    Mohanasundaram, K. M.
    INTERNATIONAL JOURNAL OF ADVANCED MANUFACTURING TECHNOLOGY, 2006, 29 (1-2): : 184 - 196
  • [5] An Orthogonal Genetic Algorithm for Job Shop Scheduling Problems with Multiple Objectives
    Feng, Ming-Yue
    Yi, Xian-Qing
    Li, Guo-Hui
    Tang, Shao-Xun
    He, Jun
    ICNC 2008: FOURTH INTERNATIONAL CONFERENCE ON NATURAL COMPUTATION, VOL 1, PROCEEDINGS, 2008, : 546 - 550
  • [6] Study of simulation generator for job shop scheduling
    Wuhan Jiaotong Keji Daxue Xuebao, 6 (612-614):
  • [7] Simulation study for dynamic scheduling in a hybrid assembly/job shop considering the JIT context
    Moon, Dug Hee
    Christy, David P.
    Production Planning and Control, 1998, 9 (06): : 532 - 541
  • [8] A simulation study for dynamic scheduling in a hybrid assembly job shop considering the JIT context
    Moon, DH
    Christy, DP
    PRODUCTION PLANNING & CONTROL, 1998, 9 (06) : 532 - 541
  • [9] Development and analysis of scheduling decision rules for a dynamic flexible job shop production system: a simulation study
    Vinod, V.
    Sridharan, R.
    INTERNATIONAL JOURNAL OF BUSINESS PERFORMANCE MANAGEMENT, 2009, 11 (1-2) : 43 - 71
  • [10] Application of Hybrid Simulation in production scheduling in job shop systems
    Rodrigues, Renato Pontes
    de Pinho, Alexandre Ferreira
    Sena, David Custodio
    SIMULATION-TRANSACTIONS OF THE SOCIETY FOR MODELING AND SIMULATION INTERNATIONAL, 2020, 96 (03): : 253 - 268