Experimental analysis of live working on 750 kV compact double circuits transmission line on the same tower

被引:0
|
作者
Xiao, Bin [1 ]
Wang, Li-Nong [1 ]
Liu, Kai [1 ]
Liu, Ting [1 ]
Hu, Jian-Xun [1 ]
Cai, Jian-Feng [2 ]
Su, Zhan-Tao [3 ]
机构
[1] State Grid Electric Power Research Institute, Wuhan 430074, China
[2] Wuxi Electric Power Company, Wuxi 214000, China
[3] NARI Technology Development Company Limiled, Nanjing 210061, China
来源
关键词
Timing circuits - Occupational risks;
D O I
暂无
中图分类号
学科分类号
摘要
引用
收藏
页码:2863 / 2868
相关论文
共 50 条
  • [21] Research on Live Working of Tower with V-type Insulator Extending to Tower Body for ±800kV UHVDC Transmission Line
    Ding Yu-jian
    Sun Hui
    Zhao Jiang-tao
    Zhou Jun
    Liao Wei-ming
    Mao Yan
    2014 INTERNATIONAL CONFERENCE ON POWER SYSTEM TECHNOLOGY (POWERCON), 2014,
  • [22] Research on air-gap discharge characteristics of 750 kV one tower double-circuit transmission line
    Chen, Yong
    Meng, Gang
    Xie, Liang
    Wan, Qi-Fa
    Gu, Ding-Xie
    2008, Science Press, 18,Shuangqing Street,Haidian, Beijing, 100085, China (34):
  • [23] Setting calculation of ground distance protection for 750 kV double circuit lines on the same tower
    Northwest Electrical Power Dispatching and Communication Center, Xi'an 710048, China
    Dianli Xitong Zidonghue, 2009, 22 (102-105):
  • [24] Simulation and experimental analysis of corona loss of 1000 kV and 500 kV AC transmission lines on same tower
    Xie, Xiongjie
    Liu, Qin
    Huo, Feng
    Zhu, Lei
    Liu, Yunpeng
    Zhou, Guoyang
    Gaodianya Jishu/High Voltage Engineering, 2013, 39 (03): : 592 - 596
  • [25] Clearing short-circuit faults transfer overvoltage of 1000 kV double circuits transmission lines on the same tower
    Chen, Shui-Ming
    Yu, Hua-Peng
    Yang, Peng-Cheng
    Gaodianya Jishu/High Voltage Engineering, 2010, 36 (01): : 68 - 73
  • [26] Analysis on secondary stress for steel-tube tower of 1000 kV double circuit transmission lines on same tower
    Li, Mao-Hua
    Yang, Jing-Bo
    Li, Zheng-Liang
    Han, Jun-Ke
    Li, Feng
    Dianwang Jishu/Power System Technology, 2010, 34 (02): : 20 - 23
  • [27] The Safety Analysis of Live Working on 500/220kV Four-parallel Lines on the Same Tower
    Yang, Qi
    Zou, Dehua
    Tong, Cheng
    Xia, Zengming
    Yan, Yu
    Li, Jinliang
    2016 IEEE INTERNATIONAL CONFERENCE ON POWER AND RENEWABLE ENERGY (ICPRE), 2016, : 15 - 18
  • [28] Analysis of live working on Yun-Guang ±800 kV DC transmission line
    Xiao, Yong
    Fan, Ling-Meng
    Gaodianya Jishu/High Voltage Engineering, 2010, 36 (09): : 2206 - 2211
  • [29] The Optimization of Entering Route for Live Working on 750 kV Transmission Towers by Space Electric-Field Analysis
    Zhuang, Chijie
    Zeng, Rong
    Zhang, Bo
    Zhu, Puxuan
    Wang, Ling
    He, Jinliang
    IEEE TRANSACTIONS ON POWER DELIVERY, 2010, 25 (02) : 987 - 994
  • [30] Optimizing protection configuration of 330 kV double transmissions line on same tower
    Wu, Y.
    Si, X.
    Zhang, H.
    Dianli Xitong Zidonghue/Automation of Electric Power Systems, 2001, 25 (07):