共 50 条
- [41] Drilling of two potash mining shafts in Belarus using a new generation of machines World of Mining - Surface and Underground, 2019, 71 (04): : 245 - 248
- [45] Two-agent scheduling on bounded parallel-batching machines with an aging effect of job-position-dependent Annals of Operations Research, 2020, 294 : 191 - 223
- [46] A NEW FORMULATION OF A BUFFERED TWO-WORKSTATION PRODUCTION LINE WITH PARALLEL UNRELIABLE MACHINES 10TH INTERNATIONAL INDUSTRIAL SIMULATION CONFERENCE 2012 (ISC 2012), 2012, : 200 - 206
- [48] Combustion power machines - Two stroke diesel motors with a new type of valve gear ZEITSCHRIFT DES VEREINES DEUTSCHER INGENIEURE, 1930, 74 : 57 - 58
- [49] A new approximation algorithm for multi-agent scheduling to minimize makespan on two machines Journal of Scheduling, 2016, 19 : 21 - 31