Chance-constrained model for high speed railway timetable rescheduling

被引:0
|
作者
Wang, Li [1 ]
Jia, Li-Min [2 ]
Xu, Jie [2 ]
Qin, Yong [2 ]
机构
[1] School of Traffic and Transportation, Beijing Jiaotong University, Beijing 100044, China
[2] State Key Laboratory of Rail Traffic Control and Safety, Beijing Jiaotong University, Beijing 100044, China
关键词
D O I
暂无
中图分类号
学科分类号
摘要
引用
收藏
页码:55 / 61
相关论文
共 50 条
  • [21] GROUNDWATER MANAGEMENT BY CHANCE-CONSTRAINED MODEL.
    Univ of Wyoming, Dep of Statistics,, Laramie, WY, USA, Univ of Wyoming, Dep of Statistics, Laramie, WY, USA
    Journal of Water Resources Planning and Management, 1986, 112 (01) : 1 - 19
  • [22] CHANCE-CONSTRAINED OPTIMIZATION MODEL FOR STRUCTURAL DESIGN
    JACOBS, TL
    JOURNAL OF STRUCTURAL ENGINEERING-ASCE, 1991, 117 (01): : 100 - 110
  • [23] CHANCE-CONSTRAINED PROGRAMMING
    CHARNES, A
    COOPER, WW
    MANAGEMENT SCIENCE, 1959, 6 (01) : 73 - 79
  • [24] CONDITIONAL CHANCE-CONSTRAINED MODEL FOR RESERVOIR CONTROL
    LANE, M
    WATER RESOURCES RESEARCH, 1973, 9 (04) : 937 - 948
  • [25] ANALYSIS OF A CHANCE-CONSTRAINED RESERVOIR CONTROL MODEL
    SNIEDOVICH, M
    WATER RESOURCES RESEARCH, 1980, 16 (05) : 849 - 853
  • [26] GROUNDWATER-MANAGEMENT BY CHANCE-CONSTRAINED MODEL
    TUNG, YK
    JOURNAL OF WATER RESOURCES PLANNING AND MANAGEMENT-ASCE, 1986, 112 (01): : 1 - 19
  • [27] A convex chance-constrained model for reactive power planning
    Lopez, Julio
    Pozo, David
    Contreras, Javier
    Mantovani, J. R. S.
    INTERNATIONAL JOURNAL OF ELECTRICAL POWER & ENERGY SYSTEMS, 2015, 71 : 403 - 411
  • [28] A Multistage Decision Optimization Approach for Train Timetable Rescheduling Under Uncertain Disruptions in a High-Speed Railway Network
    Zhang, Pu
    Zhao, Peng
    Qiao, Ke
    Wen, Pengcheng
    Li, Peng
    IEEE TRANSACTIONS ON INTELLIGENT TRANSPORTATION SYSTEMS, 2023, 24 (06) : 6307 - 6321
  • [29] The multi-objective railway timetable rescheduling problem
    Binder, Stefan
    Maknoon, Yousef
    Bierlaire, Michel
    TRANSPORTATION RESEARCH PART C-EMERGING TECHNOLOGIES, 2017, 78 : 78 - 94
  • [30] Stochastic chance-constrained surgery planning model and algorithm
    Wang S.
    Li J.
    Peng C.
    Ran L.
    Xitong Gongcheng Lilun yu Shijian/System Engineering Theory and Practice, 2019, 39 (07): : 1721 - 1731