Numerical simulation of bolt-grouting for gob-side entry in complex seam under a high stress

被引:0
|
作者
Wang, Lian-Guo [1 ]
Zhang, Zhi-Kang [1 ]
Zhang, Jin-Yao [1 ]
Huang, Chao [2 ]
机构
[1] State Key Laboratory for Geomechanics and Deep Underground Engineering, China University of Mining and Technology, Xuzhou, Jiangsu 221008, China
[2] Huaibei Mining Group, Huaibei, Anhui 243100, China
关键词
D O I
暂无
中图分类号
学科分类号
摘要
12
引用
收藏
页码:145 / 149
相关论文
共 50 条
  • [41] Stability control of gob-side entry retained under the gob with close distance coal seams
    Zizheng Zhang
    Min Deng
    Jianbiao Bai
    Shuai Yan
    Xianyang Yu
    International Journal of Mining Science and Technology, 2021, 31 (02) : 321 - 332
  • [42] Theory and Application of Gob-Side Entry Retaining in Thick Three-Soft Coal Seam
    Shen, Junchao
    Zhang, Ying
    GEOFLUIDS, 2021, 2021
  • [43] Stability control of gob-side entry retained under the gob with close distance coal seams
    Zhang, Zizheng
    Deng, Min
    Bai, Jianbiao
    Yan, Shuai
    Yu, Xianyang
    INTERNATIONAL JOURNAL OF MINING SCIENCE AND TECHNOLOGY, 2021, 31 (02) : 321 - 332
  • [44] Research and application of Gob-Side entry retaining with roof presplitting under residual coal pillar of upper coal seam
    Tian, Xichun
    Wang, Jiong
    Yu, Guangyuan
    Wang, Haoseng
    Liu, Peng
    Pan, Zhifu
    Wang, Yanjun
    ENERGY EXPLORATION & EXPLOITATION, 2022, 40 (05) : 1494 - 1521
  • [45] Study of Key Technology of Gob-Side Entry Retention in a High Gas Outburst Coal Seam in the Karst Mountain Area
    Ma, Zhenqian
    Zhang, Dongyue
    Cao, Yunqin
    Yang, Wei
    Xu, Biao
    ENERGIES, 2022, 15 (11)
  • [46] Mechanism of Coordinate Anchorage Support of Bolt-Single Anchor Cable for Gob-Side Entry Roof
    Li, Hong-chao
    Ding, Ke
    Xu, Qiang
    Zhang, Qiang
    GEOTECHNICAL AND GEOLOGICAL ENGINEERING, 2019, 37 (02) : 857 - 867
  • [47] Application of anchor cable with bolt and steel band coupling support technology in gob-side entry retaining
    Yan, Yu-Biao
    Shi, Jian-Jun
    Jiang, Zheng-Jun
    Caikuang yu Anquan Gongcheng Xuebao/Journal of Mining and Safety Engineering, 2010, 27 (02): : 273 - 276
  • [48] Numerical Simulation Study on Mechanical Characteristics and Width Optimization of Narrow Coal Pillar in Gob-Side Coal Seam Tunnel
    Zhao, Pengxiang
    Zhang, Wenjin
    Li, Shugang
    Chang, Zechen
    Lu, Yajie
    Cao, Congying
    Shi, Yu
    Jia, Yongyong
    Lou, Fang
    Wei, Zongyong
    Liu, Jun
    SUSTAINABILITY, 2022, 14 (23)
  • [49] Stability Control for Gob-Side Entry Retaining with Supercritical Retained Entry Width in Thick Coal Seam Longwall Mining
    Zhang, Zizheng
    Yu, Xianyang
    Wu, Hai
    Deng, Min
    ENERGIES, 2019, 12 (07)
  • [50] Influence of the stability of the Gob-side entry under the premise of coal gangue backfilling
    Zhang, Jianying
    Zhao, Yucheng
    Fu, Qiang
    Zhang, J. (zhaoyc1972@163.com), 1600, E-Journal of Geotechnical Engineering, 214B Engineering South, Stillwater, OK 74078, United States (18 T): : 4253 - 4262