Summary of main protection design for hydro-generators of Xiangjiaba power station and Xiluodu power station

被引:0
|
作者
Gui, Lin [1 ]
Wang, Xiangheng [1 ]
Sun, Yuguang [1 ]
Wang, Weijian [1 ]
Mao, Jiang [2 ]
Yuan, Zhipeng [3 ]
Mu, Jiwei [4 ]
机构
[1] Tsinghua University, Beijing 100084, China
[2] China Yangtze Three Gorges Group Corporation, Yichang 443002, China
[3] Mid-south Design and Research Institute, Changsha 410014, China
[4] Chengdu Hydroelectric Investigation and Design Institute, Chengdu 610072, China
关键词
D O I
暂无
中图分类号
学科分类号
摘要
引用
收藏
页码:30 / 33
相关论文
共 50 条
  • [31] The main protection scheme of internal short circuit for generator of large-sized (above 600 MW) hydroelectric power station - Based on simulation for generators of Three Gorges hydroelectric power station
    Nengling, Tai
    Xianggen, Yin
    Dianli Xitong Zidonghue/Automation of Electric Power Systems, 1999, 23 (11):
  • [32] Finite element analysis of the 500 MVA hydro-generators at the Bieudron power plant
    Schmidt, E
    Grabner, C
    Traxler-Samek, G
    ICEMS'2001: PROCEEDINGS OF THE FIFTH INTERNATIONAL CONFERENCE ON ELECTRICAL MACHINES AND SYSTEMS, VOLS I AND II, 2001, : 1072 - 1076
  • [33] Optimized main protection scheme design of 600 MW huge hydraulic generator in pubugou power station
    Xia, Yongjun
    Yin, Xianggen
    Zhang, Zhe
    Chen, Deshu
    Mao, Junxi
    Dianli Xitong Zidonghua/Automation of Electric Power Systems, 2006, 30 (14): : 92 - 96
  • [34] NEW DESIGN LOW-PRESSURE HYDRO-TURBINES FOR SMALL HYDRO POWER STATION
    Koshumbaev, M. B.
    Kvasov, P. A.
    BULLETIN OF THE NATIONAL ACADEMY OF SCIENCES OF THE REPUBLIC OF KAZAKHSTAN, 2016, (01): : 69 - 74
  • [36] Study on Control Design of Boiler Burning Main Station in Power Plant
    Wu, Xiang-hu
    Qu, Ming-cheng
    Tao, Yong-chao
    Qiao, Tian-jiao
    INTERNATIONAL CONFERENCE ON APPLIED MECHANICS AND MECHANICAL AUTOMATION (AMMA 2017), 2017, : 200 - 203
  • [37] Design and construction of a small hydro power station of 540 kW on the river Sambre
    Dick, E.
    Muyle, J.
    Descamps, F.
    Deprez, A.
    Jouniaux, R.
    European Journal of Mechanical and Environmental Engineering, 1994, 39 (01): : 27 - 32
  • [38] Sediment-reduction benefit of Xiluodu Power Station for the Three Gorges Project
    Zhu, JY
    Chen, WY
    PROCEEDINGS OF THE NINTH INTERNATIONAL SYMPOSIUM ON RIVER SEDIMENTATION, VOLS 1-4, 2004, : 898 - 905
  • [39] Viscoelasto-plastic finite element analysis of stability of surrounding rock for underground powerhouse of Xiangjiaba hydro-power station
    Nie Wei-ping
    Xu Wei-ya
    Zhou Xian-qi
    Li Liang-quan
    Liu Wei
    ROCK AND SOIL MECHANICS, 2010, 31 (04) : 1276 - 1282
  • [40] Research on key technologies of installed in three gorges right bank station fully air cooled hydro-generators
    Wang, Guo-Hai
    Zhongguo Dianji Gongcheng Xuebao/Proceedings of the Chinese Society of Electrical Engineering, 2009, 29 (15): : 74 - 79