A heuristic short-term peak regulation method of single hydropower station supplying multi power grids

被引:0
|
作者
Wang, Huawei [1 ]
Zhou, Jianzhong [1 ]
Zhang, Sheng [2 ]
Jiang, Baofeng [2 ]
Lu, Peng [1 ]
Mo, Li [1 ]
机构
[1] School of Hydropower & Information Engineering, Huazhong University of Science & Technology, Wuhan,Hubei Province,430074, China
[2] Central China Electric Power Company, Wuhan,Hubei Province,430077, China
来源
关键词
15;
D O I
10.13335/j.1000-3673.pst.2015.09.028
中图分类号
学科分类号
摘要
引用
收藏
页码:2559 / 2564
相关论文
共 50 条
  • [1] Short-Term Peak-Shaving Operation of Single-Reservoir and Multicascade Hydropower Plants Serving Multiple Power Grids
    Shengli Liao
    Yan Zhang
    Jie Liu
    Benxi Liu
    Zhanwei Liu
    Water Resources Management, 2021, 35 : 689 - 705
  • [2] Short-Term Peak-Shaving Operation of Single-Reservoir and Multicascade Hydropower Plants Serving Multiple Power Grids
    Liao, Shengli
    Zhang, Yan
    Liu, Jie
    Liu, Benxi
    Liu, Zhanwei
    WATER RESOURCES MANAGEMENT, 2021, 35 (02) : 689 - 705
  • [3] Short-term optimal scheduling of cascade hydropower plants shaving peak load for multiple power grids
    Wang, Peilin
    Yuan, Wenlin
    Su, Chengguo
    Wu, Yang
    Lu, Lu
    Yan, Denghua
    Wu, Zening
    RENEWABLE ENERGY, 2022, 184 : 68 - 79
  • [4] Study of the scheduling rules of short-term power generation dispatching for single hydropower station
    Ji, Chang-ming
    Xie, Wei
    Yang, Zi-jun
    Zhang, Xiao-xing
    Zhu, Xin-liang
    2012 INTERNATIONAL CONFERENCE ON INDUSTRIAL CONTROL AND ELECTRONICS ENGINEERING (ICICEE), 2012, : 1412 - 1416
  • [5] Multi-Station Equivalents for Short-Term Hydropower Scheduling
    Shayesteh, E.
    Amelin, M.
    Soder, L.
    IEEE TRANSACTIONS ON POWER SYSTEMS, 2016, 31 (06) : 4616 - 4625
  • [6] Practical Method for Short-term Operations of Large-scale Hydropower Plants in Power Grids With Rich Hydropower
    Shen J.
    Zhang X.
    Cao R.
    Cheng C.
    Li X.
    Wu Y.
    Zhou B.
    Zhongguo Dianji Gongcheng Xuebao/Proceedings of the Chinese Society of Electrical Engineering, 2019, 39 (10): : 2816 - 2827
  • [7] Scheduling Method for Short-term Peak-shaving Operation and Unit Commitment of Cascade Hydropower Plants Serving Multiple Power Grids
    Zhou L.
    Liao S.
    Cheng C.
    Wu X.
    Zhong R.
    Zhang Z.
    Dianwang Jishu/Power System Technology, 2020, 44 (02): : 454 - 464
  • [8] A short-term heuristic method for peak operation of pumped hydroenergy storage plants between multiple power grids on bulk power grid platform
    Cheng, Xiong
    Shen, Jianjian
    Cheng, Chuntian
    Wu, Xinyu
    Lu, Jianyu
    Li, Gang
    Dianli Xitong Zidonghua/Automation of Electric Power Systems, 2014, (09): : 53 - 60
  • [9] MILP model for short-term peak shaving of multi-grids using cascade hydropower considering discrete HVDC constraints
    Liao, Shengli
    Xiong, Jiang
    Liu, Benxi
    Cheng, Chuntian
    Zhou, Binbin
    Wu, Yuqiang
    RENEWABLE ENERGY, 2024, 235
  • [10] Short-term peak shaving model of cascade hybrid pumped storage hydropower station retrofitted from conventional hydropower
    Luo, Bin
    Liu, Xinyu
    Chen, Yongcan
    Zhou, Can
    Long, Xin
    INTERNATIONAL JOURNAL OF ELECTRICAL POWER & ENERGY SYSTEMS, 2024, 162