Optimal Allocation of Depots for Electric Bus Charging: Cost Minimization and Power System Impact Mitigation Using Mixed Integer Nonlinear Programming

被引:0
|
作者
Elkholy, Sama [1 ]
Shaaban, Mostafa F. [1 ]
Ali, Abdelfatah [1 ,2 ]
Nos, Tarnim [1 ]
Awad, Ahmed S. A. [3 ]
机构
[1] Amer Univ Sharjah, Dept Elect Engn, Sharjah, U Arab Emirates
[2] South Valley Univ, Dept Elect Engn, Qena, Egypt
[3] Sultan Qaboos Univ, Dept Elect & Comp Engn, Muscat, Oman
关键词
charging station; distribution system; electric buses; optimization; power flow; ELECTRIFICATION; STATIONS; VEHICLES;
D O I
10.1002/ese3.1955
中图分类号
TE [石油、天然气工业]; TK [能源与动力工程];
学科分类号
0807 ; 0820 ;
摘要
This paper proposes a novel approach for the optimal allocation of a depot for electric buses (EBs) charging in a specific transit service, considering the impact on the power system. The main objective is to minimize the total cost, achieved by minimizing the cost of the new cables connecting the depot station to the distribution system and the upgrade cost of existing lines to meet the additional loads. The outcomes are the optimal location of the depot, the optimal electric node bus in the distribution system to supply it, and the required system upgrades. The optimization problem is formulated as a Mixed Integer Nonlinear Programming (MINLP) model and solved using the General Algebraic Modeling System (GAMS). The methodology is tested on the H16 EB service line in Barcelona, Spain, and a typical electrical distribution system. Three case studies are presented in this paper. In the first case, the impact of a single service on the distribution network is analyzed, and in the second case, three H16 EB services are assumed to serve the network. The third case handles a multi-route, multi-terminal bus service to allocate and supply a depot capable of accommodating all the routes. This case will also include sensitivity analysis to test the robustness and reliability of the model. Results show that for a single H16 EB service, no line upgrades were needed, and the total cost per phase was $120,000. For three H16 EB services, three lines required upgrades, and the total cost per phase increased to $718,000. In the third case, the sensitivity analysis revealed that higher demand factors lead to increased costs due to more update requirements and voltage deviations. The results demonstrate that the minimum distance between the depot and node is not always the optimal or feasible solution that would prevent the depot load installation at a weak spot and meet the power flow constraints.
引用
收藏
页码:5466 / 5479
页数:14
相关论文
共 50 条
  • [21] Optimization of electric power systems with cost minimization and environmental-impact mitigation under multiple uncertainties
    Nie, S.
    Huang, Z. C.
    Huang, G. H.
    Yu, L.
    Liu, J.
    APPLIED ENERGY, 2018, 221 : 249 - 267
  • [22] Optimal phase balancing in distribution system using mixed-integer linear programming
    Khodr, H. M.
    Zerpa, I. J.
    De Oliveira-De Jesus, P. M.
    Matos, Manuel A.
    2006 IEEE/PES TRANSMISSION & DISTRIBUTION CONFERENCE & EXPOSITION: LATIN AMERICA, VOLS 1-3, 2006, : 595 - +
  • [23] A mixed-integer nonlinear programming approach to the optimal design of heat network in a polygeneration energy system
    Zhang, Jianyun
    Liu, Pei
    Zhou, Zhe
    Ma, Linwei
    Li, Zheng
    Ni, Weidou
    APPLIED ENERGY, 2014, 114 : 146 - 154
  • [24] Optimal design of electric vehicle public charging system in an urban network for Greenhouse Gas Emission and cost minimization
    Lee, Jinwoo
    Madanat, Samer
    TRANSPORTATION RESEARCH PART C-EMERGING TECHNOLOGIES, 2017, 85 : 494 - 508
  • [25] Impact of TCPAR on congestion clusters and congestion management using mixed integer nonlinear programming approach
    Kumar, Ashwani
    Singh, S. N.
    Lai, L. L.
    2006 POWER ENGINEERING SOCIETY GENERAL MEETING, VOLS 1-9, 2006, : 4391 - +
  • [26] Cost-Optimal Preventive Maintenance and Parts Replacement Schedule Using Mixed Integer Linear Programming
    Dey T.
    Samanta G.
    Sinha S.
    Journal of The Institution of Engineers (India): Series D, 2024, 105 (03) : 1463 - 1471
  • [27] Logically constrained optimal power flow: Solver-based mixed-integer nonlinear programming model
    Pourakbari-Kasmaei, Mandi
    Sanches Mantovani, Jose Roberto
    INTERNATIONAL JOURNAL OF ELECTRICAL POWER & ENERGY SYSTEMS, 2018, 97 : 240 - 249
  • [28] Mixed-Integer Optimal Control of a Residential Heating Network using Linear and Nonlinear Programming Techniques
    Kollmar, Manuel
    Frison, Lilli
    Buerger, Adrian
    Oliva, Axel
    Altmann-Dieses, Angelika
    Diehl, Moritz
    2022 EUROPEAN CONTROL CONFERENCE (ECC), 2022, : 1103 - 1109
  • [29] Optimal Placement of SVC Based on Line Flow Base Equation Using Mixed Integer Nonlinear Programming
    Etemad, Reza
    Navabi, Reza
    Shayanfar, Heidar Ali
    2010 ASIA-PACIFIC POWER AND ENERGY ENGINEERING CONFERENCE (APPEEC), 2010,
  • [30] Minimization of Operational Cost for an Islanded Microgrid using a Real Coded Genetic Algorithm and a Mixed Integer Linear Programming Method
    Lazar, Eniko
    Petreus, Dorin
    Etz, Radu
    Patarau, Toma
    2017 INTERNATIONAL CONFERENCE ON OPTIMIZATION OF ELECTRICAL AND ELECTRONIC EQUIPMENT (OPTIM) & 2017 INTL AEGEAN CONFERENCE ON ELECTRICAL MACHINES AND POWER ELECTRONICS (ACEMP), 2017, : 693 - 698