Workflow cost optimization heuristics based on advanced priority rule

被引:0
|
作者
Liu, Cancan [1 ]
Zhang, Weimin [1 ]
Luo, Zhigang [1 ]
Ren, Kaijun [1 ]
机构
[1] College of Computer, National University of Defense Technology, Changsha 410073, China
关键词
Cost optimization - Coupling strengths - Temporal mobility (TM) - Utility grids - Workflow scheduling;
D O I
暂无
中图分类号
学科分类号
摘要
The time and cost trade-off problem in workflow scheduling with deadline constraint in utility grids is an NP-hard, but attractive problem. In the past studies, the priority rule, best fit based on time-dependent coupling strength (referred as BFTCS), was adopted to solve this question because BFTCS considers both the features of resources and workflow structures and uses them as two important factors in the iterative heuristic for cost optimization. However, BFTCS did not consider another important factor: the temporal feature of the workflow. In this paper, we define temporal mobility (TM) to describe the temporal feature of the workflow, and incorporate TM into the iterative stage as an important factor to improve the workflow execution cost further. This novel priority rule (referred as best fit based on time-dependent coupling strength and temporal mobility, BFTCSTM) gives priority to the tasks with larger TM and smaller TCS (time-dependent coupling strength) during the iterative stage. Therefore, compared with BFTCS, BFTCSTM slows down the increasing rate of the workflow execution time greatly, and provides more opportunities to other tasks to optimize cost, which decreases the total cost further. The experimental results demonstrate the advantages of BFTCSTM based iterative heuristic.
引用
收藏
页码:1593 / 1600
相关论文
共 50 条
  • [31] HEFT based Workflow Scheduling Algorithm for Cost Optimization within Deadline in Hybrid Clouds
    Chopra, Nitish
    Singh, Sarbjeet
    2013 FOURTH INTERNATIONAL CONFERENCE ON COMPUTING, COMMUNICATIONS AND NETWORKING TECHNOLOGIES (ICCCNT), 2013,
  • [32] Priority-rule-based resource-constrained project scheduling with the objective of minimizing activities' cost
    Liu, Zhen-Yuan
    Wang, Hong-Wei
    Xitong Gongcheng Lilun yu Shijian/System Engineering Theory and Practice, 2006, 26 (09): : 99 - 106
  • [33] A Comparison of Heuristics for the Discrete Cost Multicommodity Network Optimization Problem
    Virginie Gabrel
    Arnaud Knippel
    Michel Minoux
    Journal of Heuristics, 2003, 9 : 429 - 445
  • [34] A comparison of heuristics for the discrete cost multicommodity network optimization problem
    Gabrel, V
    Knippel, A
    Minoux, M
    JOURNAL OF HEURISTICS, 2003, 9 (05) : 429 - 445
  • [35] Augmenting priority rule heuristics with justification and rollout to solve the resource-constrained project scheduling problem
    Xu, Ningxiong
    McKee, Sally A.
    Nozick, Linda K.
    Ufomata, Ruke
    COMPUTERS & OPERATIONS RESEARCH, 2008, 35 (10) : 3284 - 3297
  • [36] Effects of project size and resource constraints on project duration through priority rule-base heuristics
    Kanit, Recep
    Ozkan, Omer
    Gunduz, Murat
    ARTIFICIAL INTELLIGENCE REVIEW, 2009, 32 (1-4) : 115 - 123
  • [37] Effects of project size and resource constraints on project duration through priority rule-base heuristics
    Recep Kanit
    Omer Ozkan
    Murat Gunduz
    Artificial Intelligence Review, 2009, 32 : 115 - 123
  • [38] Cloud service workflow scheduling algorithm based on priority rules
    Zhao Y.
    Hu B.
    Zhang Z.
    Zhang R.
    International Journal of Internet Manufacturing and Services, 2022, 8 (03): : 254 - 266
  • [39] A rule-based workflow approach for service composition
    Chen, L
    Li, ML
    Cao, J
    PARALLEL AND DISTRIBUTED PROCESSING AND APPLICATIONS, 2005, 3758 : 1036 - 1046
  • [40] Adaptive workflow engine based on rule for clinical pathway
    Du, Gang
    Jiang, Zhi-Bin
    Diao, Xiao-Di
    Sun, Yuan-Jue
    Ye, Yan
    Yao, Yang
    Shanghai Jiaotong Daxue Xuebao/Journal of Shanghai Jiaotong University, 2009, 43 (07): : 1021 - 1026