Optimization of nitrogen and phosphorus removal in vertical subsurface flow constructed wetlands by using polypropylene pellet as part of substrate

被引:0
|
作者
College of Environmental Science and Engineering, Nankai University, Tianjin 300071, China [1 ]
不详 [2 ]
机构
来源
Huanjing Kexue/Environmental Science | 2008年 / 29卷 / 05期
关键词
D O I
暂无
中图分类号
学科分类号
摘要
引用
下载
收藏
页码:1284 / 1288
相关论文
共 50 条
  • [31] Modeling of Organic Substances and Ammonia Nitrogen Removal in Vertical Flow Constructed Wetlands
    Malinowski, Pawel
    Dabrowski, Wojciech
    JOURNAL OF ECOLOGICAL ENGINEERING, 2020, 21 (01): : 231 - 237
  • [32] Nitrogen removal in vertical flow constructed wetlands: The influence of recirculation and partial saturation
    Baggiotto, Carine
    Decezaro, Samara Terezinha
    Lutterbeck, Carlos Alexandre
    Friedrich, Marciano
    Ramírez, Rolando Jose Manuel González
    Wolff, Delmira Beatriz
    Ecological Engineering, 2025, 212
  • [33] Relationships between loading rates and nitrogen removal effectiveness in subsurface flow constructed wetlands
    Zhang R.
    Li G.
    Zhou Q.
    Zhang X.
    Frontiers of Environmental Science & Engineering in China, 2008, 2 (1): : 89 - 93
  • [34] Intermittent aeration strategy to enhance organics and nitrogen removal in subsurface flow constructed wetlands
    Fan, Jinlin
    Zhang, Bo
    Zhang, Jian
    Huu Hao Ngo
    Guo, Wenshan
    Liu, Feifei
    Guo, Yeye
    Wu, Haiming
    BIORESOURCE TECHNOLOGY, 2013, 141 : 117 - 122
  • [35] Impact of water level fluctuation on nitrogen removal in horizontal subsurface flow constructed wetlands
    Ye, Chun (yechbj@163.com), 1600, Chinese Society for Environmental Sciences (37):
  • [36] Dynamics of phosphorus, nitrogen and carbon removal in a horizontal subsurface flow constructed wetland
    Vohla, Christina
    Alas, Reirno
    Nurk, Kaspar
    Baatz, Sabrina
    Mander, Ulo
    SCIENCE OF THE TOTAL ENVIRONMENT, 2007, 380 (1-3) : 66 - 74
  • [37] Phosphorus removal in laboratory-scale unvegetated vertical subsurface flow constructed wetland systems using alum sludge as main substrate
    Babatunde, A. O.
    Zhao, Y. Q.
    WATER SCIENCE AND TECHNOLOGY, 2009, 60 (02) : 483 - 489
  • [38] Removal of Emerging Pollutants in Horizontal Subsurface Flow and Vertical Flow Pilot-Scale Constructed Wetlands
    Gikas, Georgios D.
    Papaevangelou, Vassiliki A.
    Tsihrintzis, Vassilios A.
    Antonopoulou, Maria
    Konstantinou, Ioannis K.
    PROCESSES, 2021, 9 (12)
  • [39] Removal of phosphates by pilot vertical-flow constructed wetlands using a mixture of sand and dolomite as substrate
    Prochaska, CA
    Zouboulis, AI
    ECOLOGICAL ENGINEERING, 2006, 26 (03) : 293 - 303
  • [40] Analysis on Chemical Reaction Kinetics for Phosphorus Removal of Sewage in Horizontal Subsurface Flow Constructed Wetlands
    Wang, Hao
    Yang, Zhinian
    Liu, Bo
    Li, Xuejin
    ASIAN JOURNAL OF CHEMISTRY, 2014, 26 (15) : 4623 - 4625