Projects bidding decision risk analysis based on multi-factor clustering analysis

被引:2
|
作者
机构
[1] Chao, Yang
来源
Chao, Y. | 1600年 / Asian Network for Scientific Information卷 / 12期
关键词
Bidding decision - Cluster analysis technique - Construction projects - General contractors - Project - Project characteristics - Project risk management - Scientific theories;
D O I
10.3923/itj.2013.6164.6168
中图分类号
学科分类号
摘要
Project risk management is a very complex work which the pre-bid decision-making risk is one of the important aspects among. This study is based on the consideration the facts that the general contractor risk management of project is a strong empirical work as well as the indicators described the project characteristic are mostly qualitative indicators. It adjusts the usual quantification mode of qualitative indicators did in the past. It introduced cluster analysis technique, established the analysis model based on the multi-objectives function optimum factors and hybrid scale stepwise clustering. Additionally, through the approach of established projects sample risk factor data mining, this study proposed scientific theory evidence for the decision making of general contractor construction project bidding. © 2013 Asian Network for Scientific Information.
引用
收藏
相关论文
共 50 条
  • [11] SOME PROBLEMS IN THE ANALYSIS OF MULTI-FACTOR TABLES
    SCHULL, WJ
    BULLETIN OF THE INTERNATIONAL STATISTICAL INSTITUTE, 1960, 38 (03): : 259 - 270
  • [12] Investment in deepwater oil and gas exploration projects:a multi-factor analysis with a real options model
    XinHua Qiu
    Zhen Wang
    Qing Xue
    Petroleum Science, 2015, 12 (03) : 525 - 533
  • [13] Multi-factor menu analysis using data envelopment analysis
    Taylor, Jim
    Reynolds, Dennis
    Brown, Denise M.
    INTERNATIONAL JOURNAL OF CONTEMPORARY HOSPITALITY MANAGEMENT, 2009, 21 (02) : 213 - 225
  • [14] Guide Fuzzing with Multi-Factor Potential Analysis
    Xu, Luhang
    Dong, Wei
    Yin, Liangze
    Zhong, Qiuxi
    2018 IEEE 18TH INTERNATIONAL CONFERENCE ON SOFTWARE QUALITY, RELIABILITY AND SECURITY COMPANION (QRS-C), 2018, : 477 - 482
  • [15] Investment in deepwater oil and gas exploration projects: a multi-factor analysis with a real options model
    Qiu, Xin-Hua
    Wang, Zhen
    Xue, Qing
    PETROLEUM SCIENCE, 2015, 12 (03) : 525 - 533
  • [16] Investment in deepwater oil and gas exploration projects:a multi-factor analysis with a real options model
    Xin-Hua Qiu
    Zhen Wang
    Qing Xue
    Petroleum Science, 2015, (03) : 525 - 533
  • [17] Implementation and analysis of fuzzy multi-factor assessment
    Yang, Xiaoli
    Xu, Peipei
    Yang, Jianzhen
    Zhao, Guang
    Xi'an Dianzi Keji Daxue Xuebao/Journal of Xidian University, 2000, 27 (02): : 171 - 175
  • [18] Intersection Routing Based on Fuzzy Multi-Factor Decision for VANETs
    Cao, Zhenbo
    Silva, Bhagya Nathali
    Diyan, Muhammad
    Li, Jilong
    Han, Kijun
    APPLIED SCIENCES-BASEL, 2020, 10 (18):
  • [19] Risk Management in investment projects through the Multi Criteria Decision Analysis
    Fregonara, Elena
    AESTIMUM, 2009, 54 : 87 - 112
  • [20] RESEARCH ON WATERSHED ECOLOGICAL ENVIRONMENT BASED ON MULTI-FACTOR REGRESSION ANALYSIS
    Ni, Xianfeng
    Wu, Yongxiang
    Lin, Jin
    Li, Wei
    FRESENIUS ENVIRONMENTAL BULLETIN, 2021, 30 (12): : 13135 - 13142