Design and development of ladle scheduling software for steelmaking and continuous casting

被引:0
|
作者
Research Center of Automation, Northeastern University, Shenyang 110004, China [1 ]
不详 [2 ]
机构
来源
Xitong Fangzhen Xuebao | 2007年 / 13卷 / 2913-2916+2971期
关键词
D O I
暂无
中图分类号
学科分类号
摘要
引用
下载
收藏
相关论文
共 50 条
  • [41] Two-stage Optimized Scheduling Method and Application for Steelmaking and Continuous Casting
    Wang, Xiuying
    Chai, Tianyou
    Zheng, Binglin
    Wang, Hong
    2010 AMERICAN CONTROL CONFERENCE, 2010, : 6109 - 6114
  • [42] Computer-aided simulation of steelmaking-continuous casting production scheduling
    Yu, Gang
    Tian, Nai-Yuan
    Xu, An-Jun
    Beijing Keji Daxue Xuebao/Journal of University of Science and Technology Beijing, 2009, 31 (09): : 1183 - 1188
  • [43] Dynamic CSP based scheduling algorithm for steelmaking and continuous casting with conticaster breakdown
    Wang, Bai-Lin
    Li, Tie-Ke
    Zhang, Chun-Sheng
    Zhang, Wen-Xue
    Sun, Bin
    Jisuanji Jicheng Zhizao Xitong/Computer Integrated Manufacturing Systems, CIMS, 2011, 17 (10): : 2185 - 2194
  • [44] Computer-Aided Planning and Scheduling System for Steelmaking-Continuous Casting
    Chen Kai
    Zheng Zhong
    Gao Xiao-qiang
    Liu Yi
    JOURNAL OF IRON AND STEEL RESEARCH INTERNATIONAL, 2010, 17 : 29 - 34
  • [45] A web-based visual planning and scheduling system for steelmaking and continuous casting
    Department of Logistics Engineering, University of Science and Technology Beijing, Beijing 100083, China
    Proc. Int. Conf. Inf. Manage., Innov. Manage. Ind. Eng., ICIII, (312-315):
  • [46] An improved Lagrangian relaxation approach to scheduling steelmaking-continuous casting process
    Cui, Haijuan
    Luo, Xiaochuan
    COMPUTERS & CHEMICAL ENGINEERING, 2017, 106 : 133 - 146
  • [47] Dynamic scheduling for steelmaking and continuous casting based on the programming model with varying constraints
    Key Laboratory of Integrated Automation for the Process Industry, Ministry of Education, Northeastern University, Shenyang Liaoning 110004, China
    不详
    Kong Zhi Li Lun Yu Ying Yong, 2009, 7 (771-776):
  • [48] An Estimation of Distribution Algorithm for energy-aware Steelmaking Continuous Casting Scheduling
    Wang, Guirong
    Li, Qiqiang
    Yuan, Maorong
    MACHINERY ELECTRONICS AND CONTROL ENGINEERING III, 2014, 441 : 1077 - +
  • [49] Optimal model on integrated production planning and scheduling of steelmaking and continuous casting process
    Zheng, Zhong
    Liu, Hai-Yu
    Gao, Xiao-Qiang
    He, La-Mei
    Zhang, Tao
    Chen, Kai
    Chongqing Daxue Xuebao/Journal of Chongqing University, 2010, 33 (03): : 108 - 113
  • [50] Modeling and optimal algorithm of charge and cast scheduling of steelmaking-continuous casting
    Huang Ke-Wei
    Wang Ding-Wei
    Du Bin
    Yi Jian
    2006 CHINESE CONTROL CONFERENCE, VOLS 1-5, 2006, : 384 - +