Construction of a railway tunnel in water-rich tertiary sandstone

被引:0
|
作者
Qi, Weihua [1 ]
机构
[1] Lanzhou Railway Survey and Design Institute Co. Ltd., Lanzhou, China
关键词
Dewatering;
D O I
10.13807/j.cnki.mtt.2015.01.025
中图分类号
学科分类号
摘要
The Cheng-er-shan tunnel is mainly located in water -rich tertiary sandstone, and plastic flow deformation could occur if the rockmass is disturbed due to poor stability. In this paper, the nature of tertiary sandstone, and the pros and cons of the construction methods adopted in the early stage are analyzed and summarized; a concept of dominant dewatering, supplementary grouting, heavy support, and rapid sealing is raised in terms of the design and construction; and such construction measures as advance dewatering, advance pre-support, double-layer primary support, and secondary lining are described in detail. ©, 2015, Editorial Office of Modern Tunnelling Technology. All right reserved.
引用
收藏
页码:177 / 183
相关论文
共 50 条
  • [41] Collapse mechanism and treatment measures for tunnel in water-rich soft rock crossing fault
    Zuo Q.
    Wu L.
    Lin C.
    Xu C.
    Li B.
    Lu Z.
    Yuan Q.
    Yanshilixue Yu Gongcheng Xuebao/Chinese Journal of Rock Mechanics and Engineering, 2016, 35 (02): : 369 - 377
  • [42] Surrounding rock damage characteristics of a deep tunnel crossing a water-rich fault zone
    Guo, Deyu
    Zhang, Lewen
    Zhang, Xiao
    Li, Xianghui
    Yu, Hao
    Liu, Yanshun
    Sun, Yuxue
    PHYSICS OF FLUIDS, 2025, 37 (02)
  • [43] Research and Practice of Full Plugging Groundwater Technology in Water-Rich TBM Diversion Tunnel
    Wang, Lichuan
    Zhang, Shuai
    Zhou, Zongqing
    Wu, Jian
    Bai, Tao
    Chen, Yunjuan
    Zhao, Jingbo
    Xu, Shuo
    KSCE JOURNAL OF CIVIL ENGINEERING, 2024, 28 (02) : 617 - 627
  • [44] Study on Grouting Comprehensive Technical of Karst Tunnel with Water-Rich and High-Pressure
    Zou, Yulin
    MATERIALS SCIENCE, CIVIL ENGINEERING AND ARCHITECTURE SCIENCE, MECHANICAL ENGINEERING AND MANUFACTURING TECHNOLOGY, PTS 1 AND 2, 2014, 488-489 : 786 - 789
  • [45] Failure analysis and control measures for tunnel faces in water-rich sandy dolomite formations
    Jiang, Yifan
    Zhou, Ping
    Zhou, Feicong
    Lin, Jiayong
    Li, Jinyi
    Lin, Ming
    Yongli, Qi
    Wang, Zhijie
    ENGINEERING FAILURE ANALYSIS, 2022, 138
  • [46] Research on waterproofing and drainage optimization scheme for karst tunnel lining in water-rich areas
    Zhao, Dongping
    Fan, Haobo
    Jia, Lingli
    Song, Yuxiang
    ENVIRONMENTAL EARTH SCIENCES, 2021, 80 (04)
  • [47] Laboratory modelling on sand erosion caused by tunnel leakage in water-rich sandy strata
    Peng, Sige
    Luo, Junxing
    Luo, Guanyong
    Pan, Hong
    Cao, Hong
    ACTA GEOTECHNICA, 2024, 19 (12) : 8089 - 8110
  • [48] Calculation of Limit Support Pressure for EPB Shield Tunnel Face in Water-Rich Sand
    Wang, Lin
    Han, Kaihang
    Xie, Tingwei
    Luo, Jianjun
    SYMMETRY-BASEL, 2019, 11 (09):
  • [49] Mechanical Characteristic Investigation of Shield Tunnel Segment in Water-rich Mucky Soft Stratum
    Lin, Rong-An
    Liu, Bo-Ying
    Zhongguo Gonglu Xuebao/China Journal of Highway and Transport, 2018, 31 (09): : 112 - 118
  • [50] Study on the Life-Cycle Health Monitoring Technology of Water-Rich Loess Tunnel
    Xue, Xiaohui
    Xie, Yongli
    Zhou, Xinxing
    ADVANCES IN MATERIALS SCIENCE AND ENGINEERING, 2019, 2019