- [21] Study on the application of the integrated protection and control device for 220kV intelligent substation PROCEEDINGS OF THE 4TH INTERNATIONAL CONFERENCE ON MECHATRONICS, MATERIALS, CHEMISTRY AND COMPUTER ENGINEERING 2015 (ICMMCCE 2015), 2015, 39 : 1752 - 1755
- [22] Computation of Lightning Protection System for 220kV Transmission Line Inside Substation CONFERENCE PROCEEDINGS OF 2019 5TH INTERNATIONAL CONFERENCE ON CONTROL, AUTOMATION AND ROBOTICS (ICCAR), 2019, : 29 - 34
- [23] Setting and coordination on relay protection for 35 kV large capacity transformer Dianli Xitong Baohu yu Kongzhi/Power System Protection and Control, 2010, 38 (04): : 116 - 118
- [24] Fault Component Comprehensive Impedance Based Back-up Protection Algorithm for Intelligent Substation 2015 5TH INTERNATIONAL CONFERENCE ON ELECTRIC UTILITY DEREGULATION AND RESTRUCTURING AND POWER TECHNOLOGIES (DRPT 2015), 2015, : 1050 - 1055
- [25] Analysis of mal-operation of transformer's differential protection in a 110 kV substation Dianli Xitong Zidonghua/Automation of Electric Power Systems, 2005, 29 (19): : 87 - 89
- [26] 220kV Transformer 10kV Side without Load Surge Arresters Selection Method 2018 CHINA INTERNATIONAL CONFERENCE ON ELECTRICITY DISTRIBUTION (CICED), 2018, : 1289 - 1292
- [27] Discussion on celerity zone of 220 kV transmission line protection for sensitive zone Dianli Xitong Baohu yu Kongzhi/Power System Protection and Control, 2009, 37 (13): : 92 - 93
- [28] Research on the configuration and the setting method for the zero sequence overcurrent protection at the middle-pressure side of the 500 kV transformer and in the 220 kV outgoing line Dianli Xitong Baohu yu Kongzhi/Power System Protection and Control, 2011, 39 (01): : 128 - 131
- [29] Differential protection configuration of a 10 kV large capacity distribution transformer Dianli Xitong Baohu yu Kongzhi/Power System Protection and Control, 2021, 49 (22): : 98 - 104
- [30] Discussion on 10 kV relay protection setting calculation of major users Dianli Xitong Baohu yu Kongzhi/Power System Protection and Control, 2009, 37 (09): : 97 - 99