Research on the practical production scheduling decision based on fuzzy synthetic evaluation

被引:0
|
作者
Zhang, Jia-E [1 ]
Yang, Jian-Jun [1 ]
机构
[1] School of Mechanical Engineering and Automation, Beihang Univ, Beijing 100191, China
关键词
D O I
暂无
中图分类号
学科分类号
摘要
引用
收藏
页码:79 / 84
相关论文
共 50 条
  • [41] Risk assessment based on fuzzy synthetic evaluation method
    Akter, Marin
    Jahan, Momtaz
    Kabir, Rubaiya
    Karim, Dewan Sadia
    Haque, Anisul
    Rahman, Munsur
    Salehin, Mashfiqus
    SCIENCE OF THE TOTAL ENVIRONMENT, 2019, 658 : 818 - 829
  • [42] Based on AHP and Fuzzy Comprehensive Evaluation of Residential Life Decision-Making Framework for Research
    Yuan, Wei
    Yang, Jianyong
    Zhu, Zhenying
    PROCEEDINGS OF THE 8TH INTERNATIONAL SYMPOSIUM ON HEATING, VENTILATION AND AIR CONDITIONING, VOL 3: BUILDING SIMULATION AND INFORMATION MANAGEMENT, 2014, 263 : 561 - 569
  • [43] Uncertain production scheduling based on fuzzy theory considering utility and production rate
    Wang Y.
    Jin X.
    Xie L.
    Zhang Y.
    Lu S.
    Lu, Shan (lushan@szpt.edu.cn), 2017, MDPI AG (08):
  • [44] The Research on Resource Scheduling Based on Fuzzy Clustering in Cloud Computing
    Wang Xiaojun
    Wang Yun
    Hao Zhe
    Du Juan
    PROCEEDINGS OF 8TH INTERNATIONAL CONFERENCE ON INTELLIGENT COMPUTATION TECHNOLOGY AND AUTOMATION (ICICTA 2015), 2015, : 1025 - 1028
  • [45] Research on fuzzy comprehensive evaluation for flexibility of enterprise production system based on grey theory
    Pang Qing-hua
    Du Dong
    Proceedings of 2006 Chinese Control and Decision Conference, 2006, : 1026 - +
  • [46] Risk-based decision-making for drilling waste discharges using a fuzzy synthetic evaluation technique
    Sadiq, R
    Husain, T
    Veitch, B
    Bose, N
    OCEAN ENGINEERING, 2004, 31 (16) : 1929 - 1953
  • [47] Centralized collaborative production scheduling with evaluation of a practical order-merging strategy
    Tang, Liang
    Han, Huanying
    Tan, Zhen
    Jing, Ke
    INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2023, 61 (01) : 282 - 301
  • [48] Decision Evaluation of Harbin Metro based on Fuzzy Theory
    Chen, Xiaoguo
    CIVIL ENGINEERING, ARCHITECTURE AND SUSTAINABLE INFRASTRUCTURE II, PTS 1 AND 2, 2013, 438-439 : 1024 - 1027
  • [49] Grade Evaluation Model Based on Fuzzy Decision Tree
    Zhang, Xinyue
    Wang, Tinghuan
    2018 4TH INTERNATIONAL CONFERENCE ON SYSTEMS, COMPUTING, AND BIG DATA (ICSCBD 2018), 2019, : 97 - 101
  • [50] A framework for studying practical production scheduling
    Romero-Silva, Rodrigo
    Santos, Javier
    Hurtado, Margarita
    PRODUCTION PLANNING & CONTROL, 2015, 26 (06) : 438 - 450