共 50 条
- [41] GRASP for single machine scheduling with sequence dependent setup costs and linear delay penalties Comput Oper Res, 9 (881-895):
- [42] On the single machine scheduling problem with sequence-dependent setup times and periodic maintenance 2018 5TH INTERNATIONAL CONFERENCE ON CONTROL, DECISION AND INFORMATION TECHNOLOGIES (CODIT), 2018, : 374 - 378
- [43] A PARAMETRIC ANALYSIS FOR SINGLE MACHINE SCHEDULING WITH PAST-SEQUENCE-DEPENDENT SETUP TIMES INTERNATIONAL JOURNAL OF INNOVATIVE COMPUTING INFORMATION AND CONTROL, 2010, 6 (3A): : 1113 - 1121
- [45] Scheduling with past-sequence-dependent setup times and learning effects on a single machine The International Journal of Advanced Manufacturing Technology, 2010, 48 : 739 - 746
- [48] On the scheduling with past-sequence-dependent setup times and learning effects on a single machine The International Journal of Advanced Manufacturing Technology, 2013, 68 : 2483 - 2487
- [49] Single machine scheduling with sequence-dependent setup times and delayed precedence constraints Operational Research, 2020, 20 : 927 - 942
- [50] On the scheduling with past-sequence-dependent setup times and learning effects on a single machine INTERNATIONAL JOURNAL OF ADVANCED MANUFACTURING TECHNOLOGY, 2013, 68 (9-12): : 2483 - 2487