Dynamic Scheduling Problem of Aircraft Assembly Based on Quality Prediction

被引:0
|
作者
Lu Z. [1 ]
Zhu H. [1 ]
Liao Y. [1 ]
机构
[1] School of Mechanical and Energy Engineering, Tongji University, Shanghai
基金
中国国家自然科学基金;
关键词
Aircraft assembly; Dynamic scheduling; Multi-layer iterative search algorithm; Personnel allocation; Quality prediction;
D O I
10.16339/j.cnki.hdxbzkb.2020.10.006
中图分类号
学科分类号
摘要
To improve the ability of aircraft assembly schedule to deal with unqualified assembly quality,the mapping between assembly quality and quality-related factors and the expression of uncertainty in different decision-making cycles are studied,and the integer programming model is established with the objective function of the scenario-based project expected value. Moreover,based on the trained prediction model of aircraft assembly quality,a multi-layer cyclic iterative search algorithm is designed. The first layer optimizes the execution order of activity based on the activity list coding; The second layer optimizes the personnel allocation through the assembler allocation list; The third layer solves the objective function according to the result of personnel allocation. The numerical results show that the multi-layer cyclic iterative search algorithm can keep the deviation of activity start time below 2 when the predicted workpiece quality is inconsistent with the actual value,which indicates that it is adaptable to the changes of uncertainty factors and can meet the requirements of constructing dynamic schedules for aircraft assembly. © 2020, Editorial Department of Journal of Hunan University. All right reserved.
引用
收藏
页码:45 / 55
页数:10
相关论文
共 22 条
  • [21] LU Z Q, YANG C., Modeling of resource constrained multi-project scheduling problem based on project splitting, Journal of Shanghai Jiaotong University, 51, 2, pp. 193-201, (2017)
  • [22] SUI H H., Research on short-term electric load forecasting based on BP neural network, Heilongjiang: School of Electrical Engineering and Automation, pp. 1-57, (2015)