共 22 条
- [1] BROWNING T, YASSINE A., Resource-constrained multi-project scheduling: priority rule performance revisited, International Journal of Production Economics, 126, 2, pp. 212-228, (2010)
- [2] LU Z, REN Y, WANG L, Et al., A resource investment problem based on project splitting with time windows for aircraft moving assembly line, Computers & Industrial Engineering, 135, 1, pp. 568-581, (2019)
- [3] ZHU H W, LU Z Q., Modeling and improved algorithm for resource constrained multi-project scheduling problem based on project splitting with resource transfer time, Computer Integrated Manufacturing Systems, 25, 3, pp. 586-597, (2019)
- [4] ZAMANI R., A competitive magnet-based genetic algorithm for solving the resource-constrained project scheduling problem, European Journal of Operational Research, 229, 2, pp. 552-559, (2013)
- [5] CHEN R., Particle swarm optimization with justification and designed mechanisms for resource-constrained project scheduling problem, Expert Systems with Applications, 38, 6, pp. 7102-7111, (2011)
- [6] LU H, WANG H W, LI F, Et al., Integrated scheduling and material supply planning under nonstationary stochastic demand and random supply yield, Systems Engineering-Theory & Practice, 39, 3, pp. 647-658, (2019)
- [7] GUTJAHR W., Bi-objective multi-mode project scheduling under risk aversion, European Journal of Operational Research, 246, 2, pp. 421-434, (2015)
- [8] MAGHSOUDLOU H, AFSHAR-NADJAFI B, NIAKI S., Multi-skilled project scheduling with level-dependent rework risk
- [9] three multi-objective mechanisms based on cuckoo search, Applied Soft Computing, 54, 1, pp. 46-61, (2017)
- [10] LIAO Y N, LU Z Q., Resource-constrained project scheduling problem with reworking, Computer Integrated Manufacturing Systems, 25, 11, pp. 2762-2774, (2019)