Mechanical features of cable-girder anchorage for cable-stayed bridges with steel box girders I: Theoretical model

被引:0
|
作者
机构
[1] Zhang, Qinghua
[2] Li, Qiao
来源
Zhang, Q. (swjtuzqh@126.com) | 1600年 / Editorial Office of China Civil Engineering Journal卷 / 45期
关键词
Plates (structural components) - Cable stayed bridges - Anchorages (foundations) - Beams and girders - Box girder bridges - Steel structures;
D O I
暂无
中图分类号
学科分类号
摘要
For long-span cable-stayed bridges with steel box girders, the load transfer between cables and girders is accomplished by cable-girder anchorage. With the complex load transfer mechanism and stress concentration induced by large load, rational design of cable-girder anchorage is critical to long-span cable-stayed bridges. The cable-girder anchorage of the Sutong Bridge was investigated, and the mechanism of cable-girder anchorage was studied by using theoretical model and model test. The study indicated that the results of theoretical model were in accordance with that of model test, and the availability of theoretical model was demonstrated. The load transfer mechanisms of the main components of cable-girder anchorage are markedly different from each other. The stress concentration in web plate, top and bottom plate is predominant.
引用
收藏
相关论文
共 50 条
  • [41] Experiment on performance of cable dampers influened by girder vibration for cable-stayed bridges
    College of Civil Engineering, Hebei University of Technology, Tianjin 300130, China
    不详
    Zhendong Gongcheng Xuebao, 2009, 1 (13-18):
  • [42] Mechanical analysis and model test on the cable-girder anchorage zone of Xihoumen bridge
    Tao, Xiaoyan
    Yu, Zhensheng
    Liu, Xiaoguang
    Zhang, Yuling
    Zhongguo Tiedao Kexue/China Railway Science, 2009, 30 (01): : 49 - 53
  • [43] Analysis on bearing safety of anchorage zone between girder and cable in cable-stayed bridge
    Wei, X
    Li, XZ
    Li, J
    Qiang, SZ
    PROGRESS IN SAFETY SCIENCE AND TECHNOLOGY, VOL V, PTS A AND B, 2005, 5 : 1523 - 1528
  • [44] Study on Fatigue Behavior of Anchorage of Cable and Girder of Long Span Cable-Stayed Bridge
    刘庆宽
    强士中
    张强
    Railway Engineering Science, 2001, (01) : 42 - 49
  • [45] Erection control of main girder of steel box girder cable-stayed bridge with separated decks and asymmetric cable planes
    Jia, S.-M. (jiashaomin1@163.com), 1600, Wuhan Bridge Research Institute (44):
  • [46] Fatigue Load for Cable-Girder Anchorage structure of Highway and Light-railway cable stayed bridge
    Zhao, Min
    Di, Jin
    CIVIL, STRUCTURAL AND ENVIRONMENTAL ENGINEERING, PTS 1-4, 2014, 838-841 : 1028 - 1033
  • [47] Construction control of long span steel box girder cable-stayed bridge
    Yue, Qing
    Yan, He-Zhong
    Que, Shui-Jie
    Liu, Hua
    Qin, Zhao-Fu
    Bridge Construction, 2013, 43 (04) : 54 - 60
  • [48] Nonlinear analysis of steel cable-stayed bridges
    Song, Weon-Keun
    Kim, Seung-Eock
    Ma, Sang Soo
    COMPUTER-AIDED CIVIL AND INFRASTRUCTURE ENGINEERING, 2007, 22 (05) : 358 - 366
  • [49] Monitoring and inspection of steel cable-stayed bridges
    Zhang, Q. W.
    Liu, J. F.
    Ji, Y. F.
    BRIDGE MAINTENANCE, SAFETY, MANAGEMENT AND LIFE EXTENSION, 2014, : 2794 - 2802
  • [50] Stability analysis of steel cable-stayed bridges
    Tang, CC
    Shu, HS
    Wang, YC
    STRUCTURAL ENGINEERING AND MECHANICS, 2001, 11 (01) : 35 - 48