Stack pre-marshalling problem: A heuristic-guided branch-and-bound algorithm

被引:0
|
作者
College of Information Science and Engineering, Northeastern University, Shenyang, China [1 ]
不详 [2 ]
不详 [3 ]
不详 [4 ]
机构
来源
Int J Ind Eng Theory Appl Pract | 1600年 / 5卷 / 509-523期
关键词
Engineering Village;
D O I
暂无
中图分类号
学科分类号
摘要
Branch-and-bound algorithms - Combinatorial optimization problems - Container logistics - Exact algorithms - Feasible solution - Optimum solution - Search efficiency - Stack pre-marshalling problem
引用
收藏
相关论文
共 50 条
  • [31] A biased random-key genetic algorithm for the container pre-marshalling problem
    Hottung, Andre
    Tierney, Kevin
    COMPUTERS & OPERATIONS RESEARCH, 2016, 75 : 83 - 102
  • [32] A Branch-and-Bound Algorithm for the Talent Scheduling Problem
    Liang, Xiaocong
    Zhang, Zizhen
    Qin, Hu
    Guo, Songshan
    Lim, Andrew
    MODERN ADVANCES IN APPLIED INTELLIGENCE, IEA/AIE 2014, PT I, 2014, 8481 : 208 - 217
  • [33] An enhanced branch-and-bound algorithm for a partitioning problem
    Brusco, MJ
    BRITISH JOURNAL OF MATHEMATICAL & STATISTICAL PSYCHOLOGY, 2003, 56 : 83 - 92
  • [34] A branch-and-bound algorithm for the coupled task problem
    József Békési
    Gábor Galambos
    Michael N. Jung
    Marcus Oswald
    Gerhard Reinelt
    Mathematical Methods of Operations Research, 2014, 80 : 47 - 81
  • [35] A tree search procedure for the container pre-marshalling problem
    Bortfeldt, Andreas
    Forster, Florian
    EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2012, 217 (03) : 531 - 540
  • [36] Hybrid optimization algorithm for pre-marshalling export containers
    Bian, Z. (bianzhan1990@163.com), 1600, Northeast University (29):
  • [37] Logistics optimisation of slab pre-marshalling problem in steel industry
    Ge, Peixin
    Meng, Ying
    Liu, Jiyin
    Tang, Lixin
    Zhao, Ren
    INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2020, 58 (13) : 4050 - 4070
  • [38] HEURISTIC BRANCH-AND-BOUND ALGORITHM FOR TELEPHONE FEEDER CAPACITY EXPANSION
    FREIDENFELDS, J
    MCLAUGHLIN, CD
    OPERATIONS RESEARCH, 1979, 27 (03) : 567 - 582
  • [39] A branch-and-bound and heuristic algorithm for the single-machine time-dependent scheduling problem
    Lee, Wen-Chiung
    Lin, Yu Shin
    Wu, Chin-Chia
    INTERNATIONAL JOURNAL OF ADVANCED MANUFACTURING TECHNOLOGY, 2010, 47 (9-12): : 1217 - 1223
  • [40] A branch-and-bound and heuristic algorithm for the single-machine time-dependent scheduling problem
    Wen-Chiung Lee
    Yu Shin Lin
    Chin-Chia Wu
    The International Journal of Advanced Manufacturing Technology, 2010, 47 : 1217 - 1223