Early-warning of engineering-project risk model research based on maximum entropy clustering

被引:0
|
作者
School of Economics and Management, Beijing University of Aeronautics and Astronautics, Beijing 100191, China [1 ]
机构
来源
Beijing Hangkong Hangtian Daxue Xuebao | 2008年 / 7卷 / 812-815期
关键词
4;
D O I
暂无
中图分类号
学科分类号
摘要
引用
收藏
相关论文
共 50 条
  • [21] Research on the Model of Early-warning of Logistics Outsourcing Risks Based on Four Phases
    Sun, Jiaqing
    Zheng, Han
    2008 4TH INTERNATIONAL CONFERENCE ON WIRELESS COMMUNICATIONS, NETWORKING AND MOBILE COMPUTING, VOLS 1-31, 2008, : 10615 - +
  • [22] Research on early-warning and control model of enterprise finance based on System Dynamics
    Huang, Yang
    PROCEEDINGS OF THE FIFTH INTERNATIONAL CONFERENCE ON MANAGEMENT SCIENCE AND ENGINEERING MANAGEMENT, 2011, : 294 - 298
  • [23] Risk Fuzzy Measurement and Early-warning of the Project In Material Supply Chain
    Fu, Xingfang
    Li, Jijun
    Li, Lexi
    VIBRATION, STRUCTURAL ENGINEERING AND MEASUREMENT II, PTS 1-3, 2012, 226-228 : 1844 - 1847
  • [24] Study on Reputation Risk Early-warning Model of Commercial Bank Based on AHP
    Li, Peng
    CHINESE PERSPECTIVE ON RISK ANALYSIS AND CRISIS RESPONSE, 2010, 13 : 1039 - 1044
  • [25] Establishment and validation of a prognostic risk early-warning model for retinoblastoma based on XGBoost
    Wang, Feng
    Wang, Jian
    AMERICAN JOURNAL OF CANCER RESEARCH, 2025, 15 (01): : 99 - 112
  • [26] A REAL ESTATE EVALUATION RISK EARLY-WARNING MODEL BASED ON IMMUNE ALGORITHM
    Wu, Ze-Jun
    Han, Yong
    Liang, Yi-Wen
    PROCEEDINGS OF 2007 INTERNATIONAL CONFERENCE ON MACHINE LEARNING AND CYBERNETICS, VOLS 1-7, 2007, : 314 - +
  • [27] Early-warning management of cost risk in R&D project
    Xie Kefan
    Chen Gang
    Wang Fei
    Chen Yun
    PROCEEDINGS OF THE 14TH INTERNATIONAL CONFERENCE ON INDUSTRIAL ENGINEERING AND ENGINEERING MANAGEMENT, VOLS A AND B: BUILDING CORE COMPETENCIES THROUGH IE&EM, 2007, : 407 - 411
  • [28] Study on the Model of Early-warning on the Risk of ETI Based on the Principle of Failure Science
    Wei, Huang
    2008 INTERNATIONAL SEMINAR ON FUTURE INFORMATION TECHNOLOGY AND MANAGEMENT ENGINEERING, PROCEEDINGS, 2008, : 346 - 351
  • [29] The Research of the Regional Financial Risk Early-Warning Model Integrating the Regression of Lagging Factors
    Zhu, KeNa
    Liu, DongSheng
    Wu, JiCheng
    Sun, Lan
    AASRI CONFERENCE ON COMPUTATIONAL INTELLIGENCE AND BIOINFORMATICS, 2012, 1 : 428 - 434
  • [30] Research on early warning of creep landslide by early-warning indictors based on deep displacements
    Chen H.
    Tang H.
    Ge X.
    Li Y.
    Yanshilixue Yu Gongcheng Xuebao/Chinese Journal of Rock Mechanics and Engineering, 2019, 38 : 3015 - 3024