Dynamic evaluation method for rockburst risk before stopping

被引:0
|
作者
机构
[1] Jiang, Fuxing
[2] Feng, Yu
[3] Liu, Ye
来源
Feng, Yu | 1600年 / Academia Sinica卷 / 33期
关键词
Underground structures - Mining engineering - Microseismic monitoring;
D O I
10.13722/j.cnki.jrme.2014.10.017
中图分类号
学科分类号
摘要
引用
收藏
相关论文
共 50 条
  • [41] Stopping stroke before it strikes
    不详
    JOURNAL OF CLINICAL INVESTIGATION, 2005, 115 (08): : 1968 - 1968
  • [42] New Criterion of Critical Mining Stress Index for Risk Evaluation of Roadway Rockburst
    Lianpeng Dai
    Yishan Pan
    Chengguo Zhang
    Aiwen Wang
    Ismet Canbulat
    Tianwei Shi
    Chunchen Wei
    Ronghuan Cai
    Feiyu Liu
    Xuepeng Gao
    Rock Mechanics and Rock Engineering, 2022, 55 : 4783 - 4799
  • [43] New Criterion of Critical Mining Stress Index for Risk Evaluation of Roadway Rockburst
    Dai, Lianpeng
    Pan, Yishan
    Zhang, Chengguo
    Wang, Aiwen
    Canbulat, Ismet
    Shi, Tianwei
    Wei, Chunchen
    Cai, Ronghuan
    Liu, Feiyu
    Gao, Xuepeng
    ROCK MECHANICS AND ROCK ENGINEERING, 2022, 55 (08) : 4783 - 4799
  • [44] New Criterion of Critical Mining Stress Index for Risk Evaluation of Roadway Rockburst
    Liaoning University, Shenyang
    110036, China
    不详
    110819, China
    不详
    123000, China
    不详
    2052, Australia
    Rock Mech Rock Eng, 8 (4783-4799):
  • [45] Risk assessment of rockburst via an extended MABAC method under fuzzy environment
    Liang, Weizhang
    Zhao, Guoyan
    Wu, Hao
    Dai, Bing
    TUNNELLING AND UNDERGROUND SPACE TECHNOLOGY, 2019, 83 : 533 - 544
  • [46] Dynamic numerical simulation analysis of rockburst grade evaluation based on rock mass strength
    Wang, Yalei
    Xu, Jinming
    Zhang, Yan
    SCIENTIFIC REPORTS, 2025, 15 (01):
  • [47] Early assessment of dynamic rupture hazard for rockburst risk management in deep tunnel projects
    Diederichs, M. S.
    JOURNAL OF THE SOUTHERN AFRICAN INSTITUTE OF MINING AND METALLURGY, 2018, 118 (03) : 193 - 204
  • [48] An evaluation and early warning method for rockburst based on EMS microseismic source parameters
    Ma Chun-chi
    Li Tian-bin
    Zhang Hang
    Wang Jian-feng
    ROCK AND SOIL MECHANICS, 2018, 39 (02) : 765 - 774
  • [49] Application of extension evaluation method in rockburst prediction based on rough set theory
    Zhang, Le-Wen
    Zhang, De-Yong
    Qiu, Dao-Hong
    Meitan Xuebao/Journal of the China Coal Society, 2010, 35 (09): : 1461 - 1465
  • [50] Integrated rockburst early warning model based on fuzzy comprehensive evaluation method
    He, Shengquan
    Song, Dazhao
    Mitri, Hani
    He, Xueqiu
    Chen, Jianqiang
    Li, Zhenlei
    Xue, Yarong
    Chen, Tuo
    INTERNATIONAL JOURNAL OF ROCK MECHANICS AND MINING SCIENCES, 2021, 142