Multi-agent orienteering problem with time-dependent capacity constraints

被引:10
|
作者
机构
[1] Chen, Cen
[2] Cheng, Shih-Fen
[3] Lau, Hoong Chuin
来源
Cheng, Shih-Fen | 1600年 / IOS Press BV卷 / 12期
关键词
Multi agent systems;
D O I
10.3233/WIA-140304
中图分类号
学科分类号
摘要
引用
收藏
相关论文
共 50 条
  • [41] A multi-agent model for the Vehicle Routing Problem with Time Windows
    Kefi, M
    Ghédira, K
    URBAN TRANSPORT X: URBAN TRANSPORT AND THE ENVIRONMENT IN THE 21ST CENTURY, 2004, 16 : 227 - 234
  • [42] Research on multi-agent based flexibility resource constraints project scheduling problem
    Luo Ronggui
    Tao, He
    Lu, Tan
    GLOBALIZATION CHALLENGE AND MANAGEMENT TRANSFORMATION, VOLS I - III, 2007, : 1994 - 1999
  • [43] HCP-NET for the unit commitment problem with time-dependent constraints
    Wang, B
    PROCEEDINGS OF THE 4TH WORLD CONGRESS ON INTELLIGENT CONTROL AND AUTOMATION, VOLS 1-4, 2002, : 1073 - 1077
  • [44] A project scheduling problem with labour constraints and time-dependent activities requirements
    Drezet, L. -E.
    Billaut, J. -C.
    INTERNATIONAL JOURNAL OF PRODUCTION ECONOMICS, 2008, 112 (01) : 217 - 225
  • [45] Efficient Heuristics for the Time Dependent Team Orienteering Problem with Time Windows
    Gavalas, Damianos
    Konstantopoulos, Charalampos
    Mastakas, Konstantinos
    Pantziou, Grammati
    Vathis, Nikolaos
    APPLIED ALGORITHMS, 2014, 8321 : 152 - 163
  • [46] Model organization constraints in multi-agent system
    Mao, XJ
    Chen, JJ
    INTELLIGENT INFORMATION PROCESSING II, 2005, 163 : 1 - 10
  • [47] Finite-time consensus of multi-agent systems with input saturation constraints
    Sun X.-Y.
    Wu J.
    Hou Z.-C.
    Zhang G.
    Yang W.-L.
    Han Z.-X.
    Kongzhi Lilun Yu Yingyong/Control Theory and Applications, 2020, 37 (11): : 2391 - 2397
  • [48] Consensus of Multi-agent Systems with State Constraints
    Wang, Qingling
    CLOUD COMPUTING AND SECURITY, PT I, 2017, 10602
  • [49] Adaptive Finite-Time Consensus for Multi-Agent Systems with Input Constraints
    Zhou, Yanying
    Zhang, Guoshan
    PROCEEDINGS OF THE 38TH CHINESE CONTROL CONFERENCE (CCC), 2019, : 5952 - 5957
  • [50] Multi-Agent Path Finding with Kinematic Constraints
    Honig, Wolfgang
    Kumar, T. K. Satish
    Cohen, Liron
    Ma, Hang
    Xu, Hong
    Ayanian, Nora
    Koenig, Sven
    TWENTY-SIXTH INTERNATIONAL CONFERENCE ON AUTOMATED PLANNING AND SCHEDULING (ICAPS 2016), 2016, : 477 - 485