共 50 条
- [41] Long Term Capacity Planning: The Comparison Between the Net Present Value, Return on Investment and Unitary Cost for Scale Analysis NEW GLOBAL PERSPECTIVES ON INDUSTRIAL ENGINEERING AND MANAGEMENT, 2019, : 3 - 11
- [42] A Novel Perspective on Prioritizing Investment Projects under Future Uncertainty: Integrating Robustness Analysis with the Net Present Value Model ECONOMICS-THE OPEN ACCESS OPEN-ASSESSMENT E-JOURNAL, 2024, 18 (01):
- [47] Random sampling technique for improving the net present value of resource-con-strained projects Proceedings of 2005 Chinese Control and Decision Conference, Vols 1 and 2, 2005, : 1663 - 1666
- [48] VALUE ENGINEERING ON PROJECTS IN ASIA EKISTICS-THE PROBLEMS AND SCIENCE OF HUMAN SETTLEMENTS, 1989, 56 (336-37): : 202 - 210
- [49] VALUE ENGINEERING ‘ACOUSTICS’ INTO PROJECTS Canadian Acoustics - Acoustique Canadienne, 2023, 51 (03): : 154 - 155
- [50] Feasibility analysis of Rumah Tempe Zanada establishment in Bandung using net present value, internal rate of return, and payback period 1ST INTERNATIONAL CONFERENCE ON INDUSTRIAL AND MANUFACTURING ENGINEERING, 2019, 505