共 42 条
- [23] Pipeline S and Replacement Challenges for a Critical Water Treatment Facility: San Pablo Water Treatment Plant and Clearwell Project PIPELINES 2020: CONDITION ASSESSMENT, CONSTRUCTION, REHABILITATION, AND TRENCHLESS TECHNOLOGIES, 2020, : 272 - 280
- [25] Design of Metropolitan Water District's Replacement of Casa Loma Siphon Barrel No. 1 Project, San Jacinto, California LIFELINES 2022: 1971 SAN FERNANDO EARTHQUAKE AND LIFELINE INFRASTRUCTURE, 2022, : 381 - 391
- [26] The Ohio Department of Transportation's initial design-build project, replacement of the SR 2 bridges over Newell Creek 15TH ANNUAL INTERNATIONAL BRIDGE CONFERENCE AND EXHIBITION, PROCEEDINGS, 1998, : 394 - 400
- [27] The Ohio Department of Transportation's initial design-build project, replacement of the SR 2 bridges over Newell Creek 15TH ANNUAL INTERNATIONAL BRIDGE CONFERENCE AND EXHIBITION, 1998, : 394 - 400
- [28] STUDY OF CHILD VARIANCE .3. - SERVICE DELIVERY SYSTEMS CONCEPTUAL PROJECT IN EMOTIONAL DISTURBANCE - RHODES,WC AND HEAD,S PERSONNEL AND GUIDANCE JOURNAL, 1975, 53 (10): : 801 - 802
- [30] How Innovative and Adaptive Solutions Were Used to Solve Challenges Faced by Contra Costa Water District's Canal Replacement Project PIPELINES 2020: CONDITION ASSESSMENT, CONSTRUCTION, REHABILITATION, AND TRENCHLESS TECHNOLOGIES, 2020, : 210 - 218