Research on common slack time scheduling problem with deteriorating jobs

被引:0
|
作者
Wang, Ji-Bo [1 ]
Wang, Jian-Jun [2 ]
He, Ping [2 ]
机构
[1] School of Science, Shenyang Aerospace University, Shenyang 110136, China
[2] Institute of Systems Engineering, Dalian University of Technology, Dalian 116024, China
关键词
D O I
暂无
中图分类号
学科分类号
摘要
引用
收藏
页码:932 / 936
相关论文
共 50 条
  • [21] Scheduling to a common due date on unrelated parallel-machine with deteriorating jobs
    Hsu, Chou-Jung
    ADVANCED DESIGNS AND RESEARCHES FOR MANUFACTURING, PTS 1-3, 2013, 605-607 : 521 - 527
  • [22] Batch scheduling of step deteriorating jobs
    M. S. Barketau
    T. C. E. Cheng
    C. T. Ng
    Vladimir Kotov
    Mikhail Y. Kovalyov
    Journal of Scheduling, 2008, 11 : 17 - 28
  • [23] Scheduling deteriorating jobs with ready times
    Bachman, A
    Janiak, A
    OPERATIONS RESEARCH PROCEEDINGS 1999, 2000, : 342 - 348
  • [24] Single machine scheduling with deteriorating jobs
    Jiang, Shujun
    Tang, Lixin
    2008 4TH INTERNATIONAL CONFERENCE ON WIRELESS COMMUNICATIONS, NETWORKING AND MOBILE COMPUTING, VOLS 1-31, 2008, : 7654 - 7657
  • [25] Batch scheduling of step deteriorating jobs
    Barketau, M. S.
    Cheng, T. C. E.
    Ng, C. T.
    Kotov, Vladimir
    Kovalyov, Mikhail Y.
    JOURNAL OF SCHEDULING, 2008, 11 (01) : 17 - 28
  • [26] Scheduling deteriorating jobs to minimize makespan
    Kubiak, W
    van de Velde, S
    NAVAL RESEARCH LOGISTICS, 1998, 45 (05) : 511 - 523
  • [27] Scheduling with deteriorating jobs and learning effects
    Yang, Dar-Li
    Kuo, Wen-Hung
    APPLIED MATHEMATICS AND COMPUTATION, 2011, 218 (05) : 2069 - 2073
  • [28] Scheduling deteriorating jobs under disruption
    Zhao, Chuan-Li
    Tang, Heng-Yong
    INTERNATIONAL JOURNAL OF PRODUCTION ECONOMICS, 2010, 125 (02) : 294 - 299
  • [29] SINGLE MACHINE SLACK DUE WINDOW ASSIGNMENT AND DETERIORATING JOBS
    Zhang, Li-han
    Geng, Xin-na
    Xue, Jing
    Wang, Ji-bo
    JOURNAL OF INDUSTRIAL AND MANAGEMENT OPTIMIZATION, 2024, 20 (04) : 1593 - 1614
  • [30] Scheduling step-deteriorating jobs to minimize the total completion time
    Cheng, T. C. E.
    Kravchenko, Svetlana A.
    Lin, Bertrand M. T.
    COMPUTERS & INDUSTRIAL ENGINEERING, 2020, 144