共 50 条
- [41] Analysis of pipeline leakage alarm threshold in nuclear power plant 2020 CHINESE AUTOMATION CONGRESS (CAC 2020), 2020, : 4125 - 4129
- [42] FIRE ALARM SYSTEMS AND ORGANIZATION IN A NUCLEAR-POWER PLANT BROWN BOVERI REVIEW, 1979, 66 (08): : 554 - 559
- [44] Research on Digital Control System Simulation for Nuclear Power Plants 2010 ASIA-PACIFIC POWER AND ENERGY ENGINEERING CONFERENCE (APPEEC), 2010,
- [47] RESEARCH ON FATIGUE MONITORING SYSTEM DEVELOPMENT FOR NUCLEAR POWER PLANT PROCEEDINGS OF THE 25TH INTERNATIONAL CONFERENCE ON NUCLEAR ENGINEERING, 2017, VOL 1, 2017,
- [48] RESEARCH ON FATIGUE MONITORING SYSTEM DEVELOPMENT FOR NUCLEAR POWER PLANT PROCEEDINGS OF THE 25TH INTERNATIONAL CONFERENCE ON NUCLEAR ENGINEERING, 2017, VOL 1, 2017,
- [49] Research on Distributed Monitoring and Prediction System for Nuclear Power Plant Green Energy and Technology, 2010, 44 : 310 - 314
- [50] Digital Control System Development for Turbine Control of Nuclear Power Plant IECON 2004: 30TH ANNUAL CONFERENCE OF IEEE INDUSTRIAL ELECTRONICS SOCIETY, VOL 3, 2004, : 2573 - 2576