共 50 条
- [42] ANALYSIS OF DEEPWATER PIPELINE RISER INSTALLATION BY J-TUBE PULL METHOD. Proceedings of the Annual Offshore Technology Conference, 1979, v (02): : 1047 - 1054
- [45] Good grounding for building installation - A case study PROCEEDINGS OF THE INTERNATIONAL CONFERENCE ON ELECTROMAGNETIC INTERFERENCE AND COMPATIBILITY '97, 1997, : 71 - 74
- [49] A Feasibility Study of PV Installation: Case Study at Shaqra University 2018 9TH INTERNATIONAL RENEWABLE ENERGY CONGRESS (IREC), 2018,
- [50] Stress analysis method for the large excavation of a river-crossing oil pipeline - a case study of Baiyang river oil pipeline JOURNAL OF ENGINEERING RESEARCH, 2017, 5 (01): : 105 - 123