Hybrid intelligent scheduling method and its application for steelmaking and continuous casting

被引:0
|
作者
Research Center of Automation, Northeastern University, Shenyang 110004, China [1 ]
不详 [2 ]
机构
来源
关键词
D O I
暂无
中图分类号
学科分类号
摘要
Under the technical constraints of steelmaking and continuous casting production, the hybrid intelligent scheduling method is established which includes rule-based expert systems, LP-based method with two stages and multi-layer fuzzy comprehensive evaluation for the production environment with multi-equipment, multi-process and complex production style, and the optimal solution is difficult to obtain within the rational time, an available and feasible solution can be obtained by this method. The intelligent scheduling structure is established by the hybrid intelligent scheduling method, and the software system is also designed and developed. Finally, the hybrid intelligent scheduling method is successfully applied to one large steel plant. Applied results show that the making plan time and waiting time for molten steel are highly shortened, and the utilization ratio of facilities is raised. The economic effect is good.
引用
收藏
相关论文
共 50 条
  • [41] A novel Lagrangian relaxation approach for a hybrid flowshop scheduling problem in the steelmaking-continuous casting process
    Mao, Kun
    Pan, Quan-ke
    Pang, Xinfu
    Chai, Tianyou
    EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2014, 236 (01) : 51 - 60
  • [42] Study on Compatibility between Converters and Casting Machines for Daily Steelmaking and Continuous Casting Scheduling
    MA FengcaiZHANG QunSchool of Economics and ManagementUniversity of Science and Technology BeijingBeijing PRChina
    中国管理信息化, 2009, 12 (15) : 120 - 123
  • [43] Application of neural network in steelmaking and continuous casting: A review
    Zhang, Chaojie
    IRONMAKING & STEELMAKING, 2024,
  • [44] Research on production scheduling for steelmaking and continuous casting with processing time uncertainty
    Yu, Sheng-Ping
    Pang, Xin-Fu
    Chai, Tian-You
    Zheng, Bing-Lin
    Kongzhi yu Juece/Control and Decision, 2009, 24 (10): : 1467 - 1472
  • [45] An Iterated Greedy Matheuristic for Scheduling in Steelmaking-Continuous Casting Process
    Hong, Juntaek
    Lee, Kwansoo
    Lee, Kangbok
    Moon, Kyungduk
    ADVANCES IN PRODUCTION MANAGEMENT SYSTEMS: ARTIFICIAL INTELLIGENCE FOR SUSTAINABLE AND RESILIENT PRODUCTION SYSTEMS, APMS 2021, PT I, 2021, 630 : 62 - 72
  • [46] Research for the steelmaking and continuous-casting scheduling model algorithm and system
    SUN Ling and XU Jian Information Department
    BaosteelTechnicalResearch, 2010, 4(S1) (S1) : 98 - 98
  • [47] Multi-Crane Scheduling for Steelmaking-Continuous Casting Processes
    Qiu, Yan
    Zhao, Ziyan
    Liu, Shixin
    Wang, Feng
    2022 34TH CHINESE CONTROL AND DECISION CONFERENCE, CCDC, 2022, : 68 - 73
  • [48] A Distributionally Robust Scheduling Approach for Uncertain Steelmaking and Continuous Casting Processes
    Niu, Shengsheng
    Song, Shiji
    Chiong, Raymond
    IEEE TRANSACTIONS ON SYSTEMS MAN CYBERNETICS-SYSTEMS, 2022, 52 (06): : 3900 - 3914
  • [49] A mathematical programming model for scheduling steelmaking-continuous casting production
    Tang, LX
    Liu, JY
    Rong, AY
    Yang, ZH
    EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2000, 120 (02) : 423 - 435
  • [50] Dynamic Scheduling System for Steelmaking-Refining-Continuous Casting Production
    Pang, Xin-fu
    Jiang, Ying-chun
    Gao, Liang
    Tang, Bo
    Li, Hai-bo
    Yu, Sheng-ping
    Liu, Wei
    2017 29TH CHINESE CONTROL AND DECISION CONFERENCE (CCDC), 2017, : 4710 - 4715