Hybrid intelligent scheduling method and its application for steelmaking and continuous casting

被引:0
|
作者
Research Center of Automation, Northeastern University, Shenyang 110004, China [1 ]
不详 [2 ]
机构
来源
关键词
D O I
暂无
中图分类号
学科分类号
摘要
Under the technical constraints of steelmaking and continuous casting production, the hybrid intelligent scheduling method is established which includes rule-based expert systems, LP-based method with two stages and multi-layer fuzzy comprehensive evaluation for the production environment with multi-equipment, multi-process and complex production style, and the optimal solution is difficult to obtain within the rational time, an available and feasible solution can be obtained by this method. The intelligent scheduling structure is established by the hybrid intelligent scheduling method, and the software system is also designed and developed. Finally, the hybrid intelligent scheduling method is successfully applied to one large steel plant. Applied results show that the making plan time and waiting time for molten steel are highly shortened, and the utilization ratio of facilities is raised. The economic effect is good.
引用
收藏
相关论文
共 50 条
  • [1] Intelligent scheduling software and its application in steelmaking and continuous casting
    Sch. of Info. Tech., Qingdao Univ. of S and T, Qingdao 266042, China
    不详
    Jisuanji Jicheng Zhizao Xitong, 2006, 8 (1220-1226+1234):
  • [2] Intelligent Optimization Scheduling of Steelmaking and Continuous Casting Production and Its Application
    Wang, Xiu-ying
    Chai, Tian-you
    Zheng, Bing-lin
    Yu, Sheng-ping
    Luo, Xiao-chuan
    2010 8TH WORLD CONGRESS ON INTELLIGENT CONTROL AND AUTOMATION (WCICA), 2010, : 288 - 294
  • [3] Scheduling Method for Steelmaking and Continuous Casting Production Process and Its Application
    Yu Shengping
    Pang Xinfu
    2013 32ND CHINESE CONTROL CONFERENCE (CCC), 2013, : 2420 - 2425
  • [4] Two-stage Optimized Scheduling Method and Application for Steelmaking and Continuous Casting
    Wang, Xiuying
    Chai, Tianyou
    Zheng, Binglin
    Wang, Hong
    2010 AMERICAN CONTROL CONFERENCE, 2010, : 6109 - 6114
  • [5] Dynamic Scheduling Method and Its application for Steelmaking and Continuous Casting Based on Programming Model with Changing Constraints
    Yu, Sheng-ping
    Wang, Xiu-ying
    Zhang, Zhi-yu
    Zheng, Bing-lin
    Chai, Tian-you
    PROCEEDINGS OF FIRST INTERNATIONAL CONFERENCE OF MODELLING AND SIMULATION, VOL V: MODELLING AND SIMULATION IN MECHANICS AND MANUFACTURE, 2008, : 237 - 242
  • [6] Dynamic Scheduling Method for Steelmaking-Continuous Casting
    He, Dongfeng
    Xu, Anjun
    Yu, Gang
    Tian, Naiyuan
    FRONTIERS OF MANUFACTURING AND DESIGN SCIENCE, PTS 1-4, 2011, 44-47 : 2162 - 2167
  • [7] An intelligent scheduling system for steelmaking and continuous casting complex production process
    Wang, X. Y.
    Su, B. R.
    Chai, T. Y.
    DYNAMICS OF CONTINUOUS DISCRETE AND IMPULSIVE SYSTEMS-SERIES B-APPLICATIONS & ALGORITHMS, 2006, 13E : 3751 - 3756
  • [8] Intelligent Scheduling System of steelmaking and continuous casting based on ERP/MES/PCS
    Wang, Xiuying
    Yu, Shengping
    Zheng, Binglin
    Chai, Tianyou
    WCICA 2006: SIXTH WORLD CONGRESS ON INTELLIGENT CONTROL AND AUTOMATION, VOLS 1-12, CONFERENCE PROCEEDINGS, 2006, : 7381 - 7384
  • [9] Robust Scheduling Method for Steelmaking-Continuous Casting Based on Scheduling Rule
    He Dong-feng
    Xu An-jun
    Yu Gang
    Wang Hong-bing
    Tian Nai-yuan
    JOURNAL OF IRON AND STEEL RESEARCH INTERNATIONAL, 2010, 17 : 148 - 156
  • [10] An Effective Subgradient Method for Scheduling a Steelmaking-Continuous Casting Process
    Mao, Kun
    Pan, Quan-Ke
    Chai, Tianyou
    Luh, Peter B.
    IEEE TRANSACTIONS ON AUTOMATION SCIENCE AND ENGINEERING, 2015, 12 (03) : 1140 - 1152