Cost estimating for process analyzer projects

被引:0
|
作者
Nichols, Gary D. [1 ]
机构
[1] Jacobs Engineering Group
来源
Control (Chicago, Ill) | 2007年 / 20卷 / 03期
关键词
D O I
暂无
中图分类号
学科分类号
摘要
引用
下载
收藏
页码:59 / 61
相关论文
共 50 条
  • [1] More about cost estimating process analyzer projects
    Jacobs Engineering Group
    Control, 2007, 4 (63-65): : 63 - 65
  • [2] The development of a new cost-risk estimating process for transportation infrastructure projects
    Reilly, John
    McBride, Michael
    Sangrey, Dwight
    MacDonald, Douglas
    Brown, Jennifer
    Civil Engineering Practice, 2004, 19 (01): : 53 - 75
  • [4] PRELIMINARY DESIGN AND COST ESTIMATING FOR RESERVOIR PROJECTS
    WALSKI, TM
    PELLICCIA, A
    WATER RESOURCES BULLETIN, 1981, 17 (01): : 49 - 56
  • [5] Estimating time and cost for policies and procedures projects
    Escoe, A
    STC'S 50TH ANNUAL CONFERENCE, PROCEEDINGS, 2003, : 24 - 25
  • [6] Cost estimating challenges face frontier projects
    McIntire, PB
    OIL & GAS JOURNAL, 2001, 99 (33) : 30 - 34
  • [7] Preliminary Cost Estimating for Road Construction Projects
    Mahamid, Ibrahim
    Bruland, Amund
    PROCEEDINGS OF 2010 INTERNATIONAL CONFERENCE ON CONSTRUCTION AND REAL ESTATE MANAGEMENT, VOLS 1-3, 2010, : 158 - 161
  • [8] Estimating the cost of a multistep process
    Hahn, A
    CHEMTECH, 1999, 29 (05) : 58 - 60
  • [9] Conceptual cost estimating model for water pipeline projects
    Alkhalil, M
    Assaf, S
    Rahman, WA
    Asfoor, M
    ARABIAN JOURNAL FOR SCIENCE AND ENGINEERING, 1998, 23 (1C): : 89 - 100
  • [10] Estimating of capital cost of underground car parking projects
    Bastos, Monica
    Ribeiro, Francisco
    Teixeira, Jose
    JOURNAL OF FINANCIAL MANAGEMENT OF PROPERTY AND CONSTRUCTION, 2005, 10 (02) : 126 - 132