Study on the critical driving speed of the tunnel boring machine cutterhead based on the dynamic stability

被引:1
|
作者
机构
[1] Han, Meidong
[2] Cai, Zongxi
[3] Qu, Chuanyong
来源
Qu, Chuanyong | 1600年 / Chinese Mechanical Engineering Society卷 / 50期
关键词
Driving speed - Non-linear springs - TBM cutterhead - Tunnel boring machine(TBM) - Tunnel boring machines - Tunneling efficiency - Tunneling process - Uniaxial compressive strength;
D O I
10.3901/JME.2014.21.010
中图分类号
学科分类号
摘要
Driving speed is a significant design parameter for tunnel boring machine (TBM). Low driving speed maybe reduce tunneling efficiency and high one maybe affect the safety of construction by causing the severe vibration which can make the bolts loose and make the spindle bearings broken. To determine the critical value of driving speed of the cutterhead in tunneling, a finite element model is proposed to perform the dynamic simulation on the tunneling process by introducing nonlinear spring elements to simulate the interaction between the cutterhead and the rock. Critical driving speeds to ensure the dynamic stability of the cutterhead are obtained for different rock formation. The results may be useful for determining the driving speed of TBM to control the cutterhead vibration and to reduce vibration damage. They may also be used to promote the geological adaptability and safety of TBM. © 2014 Journal of Mechanical Engineering.
引用
收藏
相关论文
共 50 条
  • [21] Tunnel boring machine cutterhead crack propagation life prediction with time integration method
    Li, Jianbin
    Zhang, Zhange
    Meng, Zhichao
    Huo, Junzhou
    Xu, Zhaohui
    Chen, Jing
    ADVANCES IN MECHANICAL ENGINEERING, 2019, 11 (06)
  • [22] Structural Variation and Reconstruction Design of Tunnel Boring Machine Cutterhead from the View of Energy
    Liu H.
    Song C.
    Lu R.
    Li B.
    Hong J.
    Hsi-An Chiao Tung Ta Hsueh/Journal of Xi'an Jiaotong University, 2023, 57 (09): : 109 - 122
  • [24] Intelligent assistant driving method for tunnel boring machine based on big data
    Dong Guo
    Jinhui Li
    Shui-Hua Jiang
    Xu Li
    Zuyu Chen
    Acta Geotechnica, 2022, 17 : 1019 - 1030
  • [25] Intelligent assistant driving method for tunnel boring machine based on big data
    Guo, Dong
    Li, Jinhui
    Jiang, Shui-Hua
    Li, Xu
    Chen, Zuyu
    ACTA GEOTECHNICA, 2022, 17 (04) : 1019 - 1030
  • [26] Theoretical and experimental study of tunnel boring machine dynamic cutting force
    Sun, Hao-kai
    Gao, Yang
    Zhu, Guang-xuan
    Xu, Fei
    Zheng, Xin-yu
    ROCK AND SOIL MECHANICS, 2023, 44 (06) : 1657 - 1670
  • [27] Coupling relationship between loads on cutterhead of tunnel boring machine and contact stiffness of gripper shoes and rocks
    Xie, Qi-Jiang
    Yu, Hai-Dong
    Shanghai Jiaotong Daxue Xuebao/Journal of Shanghai Jiaotong University, 2015, 49 (09): : 1269 - 1275
  • [28] Free-face-Assisted Rock Breaking Method Based on the Multi-stage Tunnel Boring Machine (TBM) Cutterhead
    Geng, Qi
    Wei, Zhengying
    Meng, Hao
    Macias, Francisco Javier
    Bruland, Amund
    ROCK MECHANICS AND ROCK ENGINEERING, 2016, 49 (11) : 4459 - 4472
  • [29] Free-face-Assisted Rock Breaking Method Based on the Multi-stage Tunnel Boring Machine (TBM) Cutterhead
    Qi Geng
    Zhengying Wei
    Hao Meng
    Francisco Javier Macias
    Amund Bruland
    Rock Mechanics and Rock Engineering, 2016, 49 : 4459 - 4472
  • [30] Dynamic Modeling and Trajectory Tracking Control of Tunnel Boring Machine
    Liu, Huajiang
    Wang, Jingcheng
    Zhang, Langwen
    Fei, Ling
    Zhao, Guanglei
    26TH CHINESE CONTROL AND DECISION CONFERENCE (2014 CCDC), 2014, : 4560 - 4565