共 50 条
- [41] Connecting A Nuclear Power Plant to A Weak Grid The Case of Rooppur Nuclear Power Plant and Bangladesh Power System PROCEEDINGS OF 2020 11TH INTERNATIONAL CONFERENCE ON ELECTRICAL AND COMPUTER ENGINEERING (ICECE), 2020, : 282 - 285
- [43] The Rooppur nuclear power plant: is Bangladesh really ready for nuclear power? JOURNAL OF WORLD ENERGY LAW & BUSINESS, 2015, 8 (01): : 20 - 25
- [44] Ⅳ. Electrochemical measurements in various environments ―nuclear power plant (i electrochemical measurement in nuclear power plant)― Zairyo to Kankyo/ Corrosion Engineering, 2019, 68 (01): : 2 - 8
- [48] Performance Comparison of Supervised Machine Learning Algorithms for Multiclass Transient Classification in a Nuclear Power Plant SWARM, EVOLUTIONARY, AND MEMETIC COMPUTING, SEMCCO 2014, 2015, 8947 : 111 - 122
- [49] RESEARCH ON ELECTRIC AND I&C EQUIPMENT SAFETY FUNCTION CLASSIFICATION OF NUCLEAR POWER PLANT PROCEEDINGS OF 2021 28TH INTERNATIONAL CONFERENCE ON NUCLEAR ENGINEERING (ICONE28), VOL 1, 2021,
- [50] Fukushima Nuclear Power Plant Accident and Nuclear Physicists INPC 2013 - INTERNATIONAL NUCLEAR PHYSICS CONFERENCE, VOL. 2, 2014, 66