Dynamic pricing and subsidy model for PPP projects based on satisfaction of participants

被引:1
|
作者
Deng, Xiaopeng [1 ]
Xiong, Wei [1 ]
Yuan, Jingfeng [1 ]
Li, Qiming [1 ]
机构
[1] Department of Construction Management and Real Estate, Southeast University, Nanjing 210096, China
来源
Dongnan Daxue Xuebao (Ziran Kexue Ban)/Journal of Southeast University (Natural Science Edition) | 2009年 / 39卷 / 06期
关键词
Costs;
D O I
10.3969/j.issn.1001-0505.2009.06.032
中图分类号
学科分类号
摘要
引用
收藏
页码:1252 / 1257
相关论文
共 50 条
  • [21] Selection model of concessionaire in PPP projects
    Wu, Qian
    Gao, Yanan
    ADVANCED BUILDING MATERIALS AND SUSTAINABLE ARCHITECTURE, PTS 1-4, 2012, 174-177 : 2906 - 2910
  • [22] Evaluating Demand Guarantee for PPP Projects by Real-Option Pricing
    Chu, Xiaoling
    Wang, Shouqing
    Feng, Ke
    ICCREM 2017: PREFABRICATED BUILDINGS, INDUSTRIALIZED CONSTRUCTION, AND PUBLIC-PRIVATE PARTNERSHIPS, 2017, : 155 - 162
  • [23] Research on Risk Allocation Model in PPP Projects Based on Stakeholder Network
    Yan, Tengteng
    Chen, Chuan
    Li, Guanghua
    PROCEEDINGS OF THE 2017 INTERNATIONAL CONFERENCE ON MATERIAL SCIENCE, ENERGY AND ENVIRONMENTAL ENGINEERING (MSEEE 2017), 2017, 125 : 106 - 110
  • [24] A network-based model for the assessment of success in PPP healthcare projects
    Ongel, Begum
    Tanyer, Ali Murat
    Dikmen, Irem
    INTERNATIONAL JOURNAL OF CONSTRUCTION MANAGEMENT, 2024, 24 (08) : 875 - 887
  • [25] AN INTERNATIONAL ARBITRAGE PRICING MODEL WITH PPP DEVIATIONS
    LEVINE, R
    ECONOMIC INQUIRY, 1989, 27 (04) : 587 - 599
  • [26] A DYNAMIC MODEL OF EXPORT SUBSIDY COMPETITION
    Zhou, Weifeng
    ACTUAL PROBLEMS OF ECONOMICS, 2011, (122): : 369 - 378
  • [27] Water environment treatment PPP projects optimal payment mechanism based on multi-stage dynamic programming model
    Su, Limin
    Cao, YongChao
    Li, Huimin
    Zhang, Chengyi
    ENGINEERING CONSTRUCTION AND ARCHITECTURAL MANAGEMENT, 2024, 31 (02) : 866 - 890
  • [28] The Dynamic Allocation Strategy of Profits from PPP Projects
    Cao, Junli
    Yang, Maosheng
    AGRO FOOD INDUSTRY HI-TECH, 2017, 28 (01): : 3362 - 3365
  • [29] Pricing Based on the Binary Tree Model Under Public Infrastructure Projects
    Fan, Dongjun
    PROCEEDINGS OF THE 2ND INTERNATIONAL CONFERENCE ON COMPUTER AND INFORMATION APPLICATIONS (ICCIA 2012), 2012, : 1547 - 1549
  • [30] Research on the refinancing capital structure of highway PPP projects based on dynamic capital demand
    Hou, Wenhua
    Wang, Lun
    ENGINEERING CONSTRUCTION AND ARCHITECTURAL MANAGEMENT, 2022, 29 (05) : 2047 - 2072