Vehicle integration of x-by-Wire systems as results of the EU project SPARC

被引:0
|
作者
Sulzmann, Armin [1 ]
机构
[1] DaimlerChrysler AG, Stuttgart
来源
VDI Berichte | 2007年 / 1971期
关键词
Project management;
D O I
暂无
中图分类号
学科分类号
摘要
引用
收藏
页码:53 / 70
相关论文
共 41 条
  • [21] Neural network modeling of ideal characteristics reference model for car adaption for driver X-by-wire vehicle
    Zheng, H.-Y. (zhenghy@jlu.edu.cn), 1600, Editorial Board of Jilin University (43):
  • [22] Based on the Unscented Kalman Filter to Estimate the State of Four-Wheel-Independent Electric Vehicle with X-by-Wire
    Gu, Xingjian
    Chen, Guoying
    Zong, Changfu
    SAE INTERNATIONAL JOURNAL OF COMMERCIAL VEHICLES, 2015, 8 (02) : 316 - 322
  • [23] Fault-Tolerant Permanent Magnet Motor Drive Topologies for Automotive X-By-Wire Systems
    Naidu, Malakondaiah
    Gopalakrishnan, Suresh
    Nehl, Thomas W.
    IEEE TRANSACTIONS ON INDUSTRY APPLICATIONS, 2010, 46 (02) : 841 - 848
  • [24] Quality assurance and software certification in respect to software construction of safety critical X-by-wire systems
    Kühl, M
    Müller-Glaser, KD
    ELECTRONIC SYSTEMS FOR VEHICLES, 2003, 1789 : 467 - 475
  • [25] Quality assurance and software certification in respect to software construction of safety critical X-by-wire systems
    Kühl, Markus
    Müller-Glaser, K.D.
    VDI Berichte, 2003, (1789): : 3519 - 3527
  • [26] Modular design and analysis of the x-by-wire center point steering independent suspension for in-wheel electric vehicle
    Chi, Cheng
    Xu, Ying
    Xu, Gang
    Cheng, Biyun
    Shen, Jianhao
    ADVANCES IN MECHANICAL ENGINEERING, 2018, 10 (06):
  • [27] A VR-BASED PROTOTYPING AND DEMONSTRATION PLATFORM INTEGRATING A FULLY ACTIVE X-BY-WIRE ELECTRICAL TEST VEHICLE
    Kreft, Sven
    Lorenz, Wadim
    Berssenbruegge, Jan
    Gausemeier, Juergen
    Traechtler, Ansgar
    PROCEEDINGS OF THE ASME INTERNATIONAL DESIGN ENGINEERING TECHNICAL CONFERENCES AND COMPUTERS AND INFORMATION IN ENGINEERING CONFERENCE, DETC 2010, VOL 3, A AND B, 2010, : 1373 - 1380
  • [28] Results to exemplify the joint EU project INNOTRACK - Innovative Track Systems
    Paulsson, B.
    Ekberg, A.
    PROCEEDINGS OF THE INSTITUTION OF MECHANICAL ENGINEERS PART F-JOURNAL OF RAIL AND RAPID TRANSIT, 2010, 224 (F5) : 361 - 368
  • [29] Traffic management in moving block railway systems: the results of the EU project COMBINE
    Giannettoni, M
    Savio, S
    COMPUTERS IN RAILWAYS VIII, 2002, 13 : 953 - 962
  • [30] Continuing professional development systems and requirements for graduate dentists in the EU: survey results from the DentCPD project
    Bullock, A.
    Bailey, S.
    Cowpe, J.
    Barnes, E.
    Thomas, H.
    Thomas, R.
    Phillips, S.
    Kavadella, A.
    Kossioni, A.
    Tsiklakis, K.
    Karaharju-Suvanto, T.
    Suomalainen, K.
    Kersten, H.
    Povel, E.
    Giles, M.
    Walmsley, A. D.
    Soboleva, U.
    Liepa, A.
    Akota, I.
    EUROPEAN JOURNAL OF DENTAL EDUCATION, 2013, 17 : 18 - 22