New method for forecasting subgrade settlement of railway passenger dedicated line

被引:0
|
作者
Chen, Shan-Xiong [1 ]
Wang, Xing-Yun [1 ,2 ]
Xu, Xi-Chang [1 ]
Wang, Xiao-Gang [1 ]
机构
[1] State Key Laboratory of Geomechanics and Geotechnical Engineering, Institute of Rock and Soil Mechanics, Chinese Academy of Sciences, Wuhan 430071, China
[2] Hubei Provincial Electric Power Survey and Design Institute, Wuhan 430024, China
来源
Yantu Lixue/Rock and Soil Mechanics | 2010年 / 31卷 / 02期
关键词
D O I
暂无
中图分类号
学科分类号
摘要
10
引用
收藏
页码:478 / 482
相关论文
共 50 条
  • [31] Study on Construction and Operation of the Passenger Dedicated Railway Line in the Process of China's Urbanization
    Niu Yongtao
    Han Baoming
    URBANIZATION AND LAND RESERVATION RESEARCH, 2009, : 1 - +
  • [32] Passenger demand forecasting for railway systems
    Nar, Melek
    Arslankaya, Seher
    OPEN CHEMISTRY, 2022, 20 (01): : 105 - 119
  • [33] Deformation monitoring and evaluating technology for subgrade of unballasted track on Lan-Xin passenger dedicated line
    Su Qian
    Zhang Wenchao
    Zhang Lisong
    Zhang Jian
    ADVANCES IN CIVIL STRUCTURES, PTS 1 AND 2, 2013, 351-352 : 1152 - 1158
  • [34] Settlement Monitoring of Passenger Railway Tianjin to Qinhuangdao
    He, Yuelei
    Shi, Rong
    ADVANCES IN STRUCTURES, PTS 1-5, 2011, 163-167 : 2637 - 2640
  • [35] The Passenger Train Plan Based on Passenger Dedicated Line
    Wang, Sheng-nan
    4TH INTERNATIONAL CONFERENCE ON ECONOMICS AND MANAGEMENT (ICEM), 2017, : 375 - 379
  • [36] Wuhan - Guangzhou Passenger Dedicated Line (WGPDL)-1000 km Highspeed-Railway-Line in Central China
    Kreutzer, M.
    Kirschke, D.
    Vogt, L.
    BAUINGENIEUR, 2009, 84 : 185 - 194
  • [37] Interaction analysis between night train operation and maintenance time on passenger dedicated railway line
    Nie, Lei
    Hu, Bisong
    Fu, Huiling
    Tong, Lu
    Journal of Transportation Systems Engineering and Information Technology, 2010, 10 (05) : 66 - 72
  • [38] Study on the Evolution of Railway Hub Logistics Spatial Network under Passenger Dedicated Line Conditions
    Zou Yifeng
    Liu Ting
    Xie Ruhe
    MANAGEMENT, MANUFACTURING AND MATERIALS ENGINEERING, PTS 1 AND 2, 2012, 452-453 : 858 - +
  • [39] The Analysis about the Post-Evaluation Mechanism on Railway Passenger Dedicated Line Construction Project
    Ren, Xu
    Huang, Na
    PROCEEDINGS OF 2010 INTERNATIONAL CONFERENCE ON CONSTRUCTION AND REAL ESTATE MANAGEMENT, VOLS 1-3, 2010, : 605 - 608
  • [40] Mode Selection of Railway Passenger Dedicated Line Transportation Organization Based on Analytic Hierarchy Process
    Fu, Meng
    MANUFACTURING PROCESS AND EQUIPMENT, PTS 1-4, 2013, 694-697 : 3314 - 3320