Mittweida is a meeting place for the eighth time in dam monitoring industry

被引:0
|
作者
Franke, Jörg [1 ]
机构
[1] EnBW Kraftwerke AG, Schelmenwasenstraße 15, 70567 Stuttgart, Germany
关键词
D O I
10.1365/s35147-012-0310-1
中图分类号
学科分类号
摘要
引用
收藏
页码:100 / 101
相关论文
共 50 条
  • [21] Real-time structural monitoring of the Campos Novos dam
    Tiago Luís Duarte Forti
    Paula Baranauskas Dutra Silva
    João Rodolfo Cortes Pires
    Luís Fernando Pedroso Melegari
    Isabela Niedo Marchiori
    Guilherme da Silva Muniz
    Journal of Civil Structural Health Monitoring, 2024, 14 : 963 - 978
  • [22] Geomatics applied to dam safety DGPS real time monitoring
    Galan-Martin, D.
    Marchamalo-Sacristan, M.
    Martinez-Marin, R.
    Sanchez-Sobrino, J. A.
    INTERNATIONAL JOURNAL OF CIVIL ENGINEERING, 2013, 11 (2A) : 134 - 141
  • [23] Real-time structural monitoring of the Campos Novos dam
    Forti, Tiago Luis Duarte
    Silva, Paula Baranauskas Dutra
    Pires, Joao Rodolfo Cortes
    Melegari, Luis Fernando Pedroso
    Marchiori, Isabela Niedo
    Muniz, Guilherme da Silva
    JOURNAL OF CIVIL STRUCTURAL HEALTH MONITORING, 2024, 14 (04) : 963 - 978
  • [24] Goethe's Exploration of the Place and Time of the Meeting between Faust and Helena
    Hamm, Heinz
    GOETHE JAHRBUCH, 2018, 135 : 220 - 225
  • [25] Annual meeting 2008 of the Association of the Merchants of the German Sugar Industry took place in Kassel
    不详
    ZUCKERINDUSTRIE, 2008, 133 (09): : 599 - 600
  • [26] It's Time for Change Industry Meeting with a view to future Prospects in the Meat and Agricultural Industry
    不详
    FLEISCHWIRTSCHAFT, 2023, 103 (10): : 14 - 18
  • [27] Statistical analysis in real time of monitoring data for Idukki arch dam
    Chouinard, LE
    Nedushan, BA
    Feknous, N
    Sesha, B
    DAM SAFETY EVALUATION - 2ND INTERNATIONAL CONFERENCE, VOLS 1 AND 2, 1996, : 803 - 808
  • [28] Statistical analysis in real time of monitoring data for Idukki arch dam
    Chouinard, LE
    Nedushan, BA
    Feknous, N
    Sesha, B
    DAM SAFETY EVALUATION - 2ND INTERNATIONAL CONFERENCE, SELECT PAPERS, 1997, : 381 - 386
  • [29] Real-time GPS monitoring Libby Dam, Libby, Montana
    Hillman, BA
    Baldwin, C
    Medley, E
    Meyerholtz, S
    REDUCING RISK FROM EXTREME EVENTS, 2003, : 257 - 266
  • [30] Displacement monitoring of upper Atbara dam based on time series InSAR
    Wang, Q. Q.
    Huang, Q. H.
    He, N.
    He, B.
    Wang, Z. C.
    Wang, Y. A.
    SURVEY REVIEW, 2020, 52 (375) : 485 - 496